Laserfiche WebLink
Page 4 of 20 <br />Job Condition Correction Factor <br />Operator Skill: <br />Material consistency: <br />Dozing method: <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />Adjusted unit <br />production: <br />Adjusted fleet <br />production: <br />Source <br />1.000 <br />(EXCL.) <br />1.000 <br />(CAT HB) <br />1.000 <br />(GEN.) <br />1.000 <br />(AVG.) <br />0.790 <br />(3 SHIFTS/DAY) <br />0.900 <br />(SSD-FC) <br />1.115 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />0.929 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.7365 <br />JOB TIME AND COST <br />1,493.62 LCY/hr <br />5974.48 LCY/hr <br />Fleet size: 4 Dozer(s) <br />Unit cost: $0.260/LCY <br />Total job time: <br />Total job cost: <br />13.25 Hours <br />$20,580 <br />CIRCES Cost Estimating Software <br />