My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-10-14_REVISION - C1981010
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981010
>
2020-10-14_REVISION - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2020 12:40:13 PM
Creation date
10/14/2020 12:20:30 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Revision
Doc Date
10/14/2020
Doc Name
Reclamation Cost Estimate
Type & Sequence
PR10
Email Name
RAR
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 3 of 20 <br />Task description: Haul Road <br />Site: Trapper Mine <br />PROJECT IDENTIFICATION <br />BULLDOZER WORK <br />Permit Action: PR10 <br />Task #: 001 State: Colorado <br />Date: 9/29/2020 County: Moffat <br />User: RAR <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Cat D10T - IOSU <br />Horsepower: <br />574 <br />Blade Type: <br />Semi -Universal <br />Attachment: <br />3-shank ripper <br />Shift Basis: <br />3 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper own. <br />Cost/Hour: <br />Ripper op. Cost/Hour: <br />Operator Cost/Hour: <br />Permit/Job#: C1981010 <br />Abbreviation: None <br />Filename: PR10 <br />$170.04 <br />Utilization % <br />NA <br />$153.03 <br />100 <br />$20.48 <br />NA <br />$3.07 <br />25 <br />$41.55 <br />NA <br />Total unit Cost/Hour: $388.17 <br />Total Fleet Cost/Hour: $1,552.67 <br />MATERIAL QUANTITIES <br />Initial Volume: 63,350 <br />Swell factor: 1.250 <br />Loose volume: 79,188 LCY <br />Source of estimated volume: Permit Appendix A, Tables A-2.3, A.6.1 <br />Source of estimated swell Operator, Appendix A <br />factor: Table A-6.1 <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />Materials consistency description <br />Average push -5 % <br />gradient: <br />Average site altitude: <br />Material weight: <br />Weight description: <br />80 feet <br />2,028.0 LCY/hr <br />: Consolidated stockpile 1.0 <br />6.725 feet <br />2.475 lbs/LCY <br />User Provided <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.