Laserfiche WebLink
22. Per Rule 6.3.4(1)(c)(ii)- Will trails/roads be decompacted prior to reclamation? <br /> Yes—in the above prescribed fashion with the exception of the historic access road between the <br /> claim boundaries and BLM -297 route, <br /> 23. Per Rule 6.3.4(2)-Provide a reclamation cost estimate by project area with input values(volumes, <br /> distances, dimensions, etc.). <br /> Project Area Project Project Backfilling Grading Topsoil Seeding Reclamation <br /> Name Area Area (cubic (cubic (cubic (acres) Cost <br /> Size Acres yards) yards) yards) Estimate <br /> (feet) <br /> Ridgetop 60 x 45 0.25 400 75 25-50 0.50 1750.00 <br /> Siberia 30 x 42 0.05 0 0 0 0.10 30.00 <br /> Midway 35 x 25 0.08 0 * 0 * 0 * 0.10 30.00 <br /> Connector 50 x 40 0.01 0 ** 0 ** 10 0.10 60.00 <br /> Purple Pipe 45 x 85 0.01 125 0 0 0 375.00 <br /> Unnamed 45 x 55 0.02 Unknown 0 0 0 0.00 <br /> Subtotal 2245.00 <br /> Mobilization 125.00 <br /> Extra Seed 130.00 <br /> Reclamation Estimate 2500.00 <br /> *This is a reclamation project. <br /> ** Impossible to get <br /> equipment into this <br /> section <br />