b. Per Rule 6.3.3(1)(f), What is the dimensions of the area to be worked under this phase? <br /> This Project Area Map has been updated and this information is shown on the map. <br /> Connector Project Area=65 feet x 55 feet <br /> c.Applications of limited amounts of topsoil is mentioned. What is the source of this topsoil?Will any soil <br /> be stockpiled from this project area, if so describe. <br /> There is limited topsoil within the debris. It is our intent to mix this with tailings that we move <br /> and enrich with mulch and seed. Additional topsoil may be brought down from the Ridgetop <br /> Soil Storage on a limited basis. It is our effort not to allow any more dirt to go down the hillside! <br /> 14. Purple Pipe Area- <br /> a. Describe the methodology of mining in more detail for this phase(rock picking,stripping surface, <br /> underground portal, etc.). <br /> This has been addressed under the Mine Plan for that Project Area in Exhibit C—Question 17 <br /> b. Pursuant to Rule 6.3.3(1)(c), What is the anticipated depth of overburden. <br /> Unknown at this time—We discovered mineralization exposed all the way to the surface. As <br /> stated above,we will file or re-file any changes to the surface or technical aspects of this project <br /> area. <br /> c. Per Rule 6.3.3(1)(d), What is the anticipated depth of material to be mined. <br /> Also unknown at this time but should not exceed the 45 foot depth of the Ridgetop Project area. <br /> d. Per Rule 6.3.3(1) (f), The dimension of this area to be mined and the waste rock storage pile if different <br /> than the mined areas. <br /> This Project Area Map has been updated and this information is shown on the map. <br /> Purple Pipe Project Area = 55 feet x 85 feet <br /> All soil and waste rock with be transported to Ridgetop Soil and Waster Rock Storage Areas. <br /> 15. Yet Unnamed Project Area-Provide details of the anticipated operation pursuant to Rule 6.3.3(1). <br /> Can be described in general terms with a commitment to submit Technical Revision and gain approval <br /> prior to commencement of this phase. <br /> This has been addressed under the Mine Plan for that Project Area in Exhibit C—Question 17 <br />