Laserfiche WebLink
To sum up all up in a spreadsheet.... <br /> Phase Project Area Area of Soil/Rock Support Trails/ Totals <br /> Disturbance Storage Areas Travel <br /> 1 Ridgetop 0.08 0.04 0.01 0.03 0.25 <br /> 2 Siberia 0.02 0.00 0.01 0.02 0.05 <br /> 2 Midway 0.07 0.00 0.00 0.01 0.08 <br /> 3 Connector 0.01 0.00 0.00 0.00 0.01 <br /> 4 Purple Pipe 0.02 0.00 0.00 0.00 0.02 <br /> 5 Unnamed 0.01 0.01 0.00 0.00 0.02 <br /> Fences 0.01 0.01 <br /> TOTALS(in acres) 0.21 0.05 0.02 0.06 0.34 <br /> Max Area to 0.50 <br /> be used <br /> Total area 1.0 <br /> to bond <br /> All project areas are HAND TOOL ONLY! <br /> The following is the current list of tools "on site": <br /> Rock Hand Truck <br /> Wheelbarrow <br /> Shovels <br /> Sledge Hammers <br /> Chisels <br /> Pry Bars <br /> Breaker Bars <br /> Hand winch <br /> Tow straps <br /> wood and plastic hand tools <br /> brushes <br /> water sprayer <br /> first aid kit <br /> water storage container(replacing) <br /> Security Gear: <br /> trail cameras <br /> cellular trail cameras <br /> Solar Panels <br /> Cable locks <br />