Laserfiche WebLink
16)Please provide an estimate of the actual costs to reclaim the site based on what it would <br /> cost the State of Colorado using an independent contractor to complete reclamation. The <br /> Office adds up to an additional maximum eighteen and one half(18.5%) percent of that <br /> total, which includes a private contract, typical overhead costs and profit. <br /> Direct Cost: <br /> i. Backfilling: (cubic yards) X $ - (cost per yard) = Total $ <br /> ii. Grading: �(cubic yards) X $ _(cost per yard) =Total $ <br /> iii. Topsoil: (cubic yards) X $ (cost per yard) =Total $ <br /> iv. Seeding: (acres) X $_ aEO (cost per acre) =Total $ 3t'� <br /> v. Mobilization: �_ (Pieces of equipment) X $ 2 5 - (cost per equipment) _ <br /> �r <br /> Total $ . <br /> Direct Cost Subtotal: $ a/ <br /> Division's total overhead cost: X 18.5% <br /> Division's Total cost: $ a5 VU �- <br /> Note: Based on the Division's experience the required financial warranty is normally set at <br /> approximately$2,500 per acre. Therefore, a typical 5 acre permit will have a total required financial <br /> warranty in the amount of$12,500. <br />