Laserfiche WebLink
All initial permitting and mining efforts were performed by Utah International. In July 1982,Utah <br /> International formed the subsidiary, Trapper Mining Inc. to consolidate and hold the properties and <br /> rights that make up Trapper Mine. The owners of the Craig Generating Station,the electric utility <br /> receiving its coal from Trapper Mine,purchased Trapper Mining Inc. in July of 1983. <br /> For additional information about the history of the permit application,please see Permit Renewals <br /> RN6 and RN7 available in DRMS's document management system previously referenced. This <br /> findings document replaces Trapper Mine's previous findings document associated with Permit <br /> Renewal RN6, RN7 and Midterm Review MT6. Please note that much of the information in this <br /> document is derived from those previous documents. <br /> The Review Process: Permit History and Revisions <br /> The following revisions have been submitted since the last midterm review(MT8) dated June 16, <br /> 2020. For details regarding the revision history between Permit Renewal RN7 and MT8 please refer <br /> to the MT8 findings documents available on the Laserfiche weblink here: <br /> https:Hdnrweblink.state.co.us/drms/search.aspx?cr=1 <br /> Table ]-]: Minor Revisions (MR) <br /> Submittal Proposed Decision Permitting Action <br /> Date(s) <br /> NM25 6 June 2020 Three Groundwater Monitoring Wells <br /> Table 1-2: Technical Revisions (TR) <br /> Submittal Proposed Decision Permitting Action <br /> Date(s) <br /> TR125 7 May 2020 Annual Reclamation Report 2019 <br /> Table 131: Permit Revisions (PR) <br /> Submittal Proposed Decision Dates Permitting Action <br /> PR9 7 August 2020 Permit Revision <br /> Table 1-4: Surety Releases (SL <br /> Submittal Proposed Decision Released Released Released Reduction in <br /> Date(s) Area Ph I Area Ph II Area Ph III Liability <br /> (acres) (acres) (acres) <br /> SL21 Proposed/pending 298.3 <br /> SL22 Proposed/pending 175 <br /> Status of Stipulations <br /> The stipulation history for the Trapper Mine was reviewed with this renewal application. The review <br /> included an investigation of any stipulations imposed, and any responses to existing stipulations <br /> received, since the last midterm review. Any stipulations associated with this permit and issued over <br /> the life of this operation which are not discussed in this renewal application have been complied with <br /> or terminated. <br /> 4 <br />