Tracks still need to be removed in the area crossing Hwy 40. The photo above shows the area to the North of Hwy <br />40 where the area rail ballast was removed. The parking lot for the trail use is shown in the lower right of the <br />photo. <br />DOCUMENTS RECEIVED <br />OTHER (SPECIFY) <br />PR2 was found complete on 9/30/20, adequacy is from the Division by 11/29/20, decision due date is 1/28/21 <br />ENFORCEMENT ACTIONS/COMPLIANCE <br />No enforcement actions were initiated as a result of this inspection, nor are any pending. <br />