Lorendto Drill Agreement
<br /> NECC will coordinate with Evergreen to use their locator before the start of the
<br /> project and NECC will also call 811 to have any lines identified near the program.
<br /> 7. Description of drilling plan by location including rotary/core for
<br /> specific coal seams/overburden/underburden,samples,etc.;
<br /> Depth of drill holes range from 105 to 1,335 feet in depth as indicated in Table 2
<br /> below. Table 3 below shows the description of drilling by location.
<br /> Table 2:Approximate Drill Hole Location and Depth
<br /> Location* Approximate Depth to
<br /> Hole no. Primero Seam unless
<br /> Northing Easting noted feet
<br /> LC-01-20 1,164,358 3,187,957 420
<br /> LC-02-20 1,164,389 3,191,414 615
<br /> LC-03-20 1,164,808 3,196,785 355
<br /> LC-04-20 1,167,853 3,198,095 395
<br /> LC-05-20 1,163,910 3,201,549 547
<br /> LC-06-20 1,160,654 3,204,556 315
<br /> LC-07-20 1,160,538 3,212,650 255
<br /> 305 Primero
<br /> LC-08-20 1,151,556 3,208,835 1,275 Verme'o
<br /> LC-09-20 1 1,146,185 3,209,850 585
<br /> LC-10-20 1,152,361 3,201,368 690
<br /> LC-11-20 1,154,647 3,195,841 665
<br /> LC-12-20 1,158,626 3,193,740 830
<br /> 420 Primero
<br /> LC-13-20 1,159,747 3,198,660 1,335 Venne'o
<br /> LC-14-20 1,155,901 3,199,853 780
<br /> LC-15-20 1,155,942 3,203,030 525
<br /> LC-16-20 1,152,398 3,206,188 67
<br /> Total 9,654
<br /> *state plane zone 0503
<br /> 7
<br /> Exhibit A 9/24/2020
<br />
|