DURAY SILVER MIAE <br /> approximately 3.1 acres. We believe this explains the discrepancy between the 12.43 acres and <br /> the 9.3 acres discussed in Section 3.3. The Revegetated Areas,the Waste Rock Areas, and the <br /> number of acres to receive topsoil are depicted on Map F-1,which is included in Attachment 2. <br /> S. DRMS Comment:Map F-1 a Structure Reclamation Map <br /> The "Demolition Work"page of the revision references the removal of structures that are not <br /> shown on Map F-1 a. The structures that are listed on the Demolition Page but are not included <br /> on the map are the Tailings conveyor, Portal Cover Structure and Storage Building(Quonset, <br /> Empty). Similarly, Table L-1 lists item 9 as a Half-Culvert Removal however the half-culvert is <br /> not indicated on map F-1 a. Please provide a narrative clarifying the removal of these structures, <br /> include any specialized equipment required for the removal of the structures, and update Map F- <br /> 1 a to reflect the location of the structures. <br /> OSMI Response: The naming convention of several structures that were in the original <br /> Reclamation Cost Estimate worksheets has been modified. The Tailings Conveyor listed on <br /> Demolition Work page was never constructed, and there are no plans to construct such a <br /> structure. Therefore, it has been removed from the Reclamation Cost Worksheet. The Portal <br /> Cover Structure is included as part of the Rail Yard&Battery Charging facility,which is listed <br /> as item 7 on Map F-la. The Quonset storage building was removed and is no longer on site and <br /> therefore,that line item has been removed from the Demolition Work cost estimate worksheet. <br /> The Demolition Work page of the reclamation cost estimate worksheets has been updated, a <br /> copy of which is included in Attachment 3. All half culverts will be removed and disposed of as <br /> scrap metal and require no specialized equipment for removal. <br /> 6. DRMS Comment.Appendix 2,Exhibit E- Updated Reclamation Plan <br /> a. In the introduction section of Appendix 2, Exhibit E- Updated Reclamation Plan there are <br /> discrepancies in the number of acreages stated. The total permit acreage listed on Page E-1 <br /> indicates the inclusion of 38.23 Acres in Governor's Basin, however in the review process of <br /> AM-01 the acres associated with Governor's Basin were removed from the application and <br /> therefore not part of the Permit Area. Similarly, there is.46 Acres listed for Shafts, however the <br /> Monongahela Vent Raise and Secondary Escapeway is not listed. The total number of Acres <br /> included in the Permit Area is in conflict with records held by the Division. Our records indicate <br /> the total Permit Area is 50.3 Acres. Please clam the total number of Acres in the Permit Area <br /> to include the 960 Incline Vent Raise, the Yellow Rose Raise and Secondary Escapeway and the <br /> Monongahela Vent Raise and Secondary Escapeway. <br /> OSMI Response: The inclusion of the 38.23 acres from Governor Basin was in error and has <br /> been removed. A revised Exhibit E is included as Attachment 4.A summary of the permitted <br /> acreage chronology is provided below. <br /> 1) Initial Permit Application—34.19 acres,which included 33.5 acres at the main portal area <br /> and 0.69 acres for 3 ventilation shafts at 100 x 100 feet each(i.e.,the 960 Raise,the <br /> Yellow Rose Shaft, and the Monogahela Shaft). <br /> 4 1 P a g e <br />