Laserfiche WebLink
Table E-2 Reclamation Timetable <br /> Task# Description Time <br /> Needed <br /> (Months) <br /> 1 Build new surface shop and underground shop 2 <br /> 2 Regrade old Revenue waste and stabilize slopes; build 2 <br /> Sediment Pond 2 and mine water pond <br /> 3 Commence mining. Construct Sediment Pond# 1 and Atlas 1 <br /> TSF regrading <br /> 4 Mine underground ore material and construct Revenue TSF. 42.1 <br /> Ore will also be brought to the mill from Governor Basin <br /> 5 Mine underground ore material and build Atlas TSF. Ore will 26.1 <br /> also be brought to the mill from Governor Basin. Cap and <br /> revegetate Revenue TSF. Store topsoil for Atlas TSF. <br /> 6 Complete mining. Cap and revegetate Atlas TSF 2 <br /> 7 Backfill underground storage and mill portals. Remove 2 <br /> sediment from Pond#1. <br /> 8 Remove select surface facilities 1 <br /> 9 Backfill underground storage portal and tailings loadout 0.5 <br /> portal <br /> 10 Cap and revegetate remaining disturbance areas. Install 1 <br /> Revenue Portal bat gate. <br /> Total Months 79.7 <br /> Total Years 6.64 <br /> 3 RECLAMATION AREAS <br /> The following sections describe the different reclamation areas for the site. <br /> Exhibit E Reclamation Plan E-2 <br /> Technical Revision 11 <br /> September 2020 <br />