Laserfiche WebLink
EXHIBIT E <br /> RECLAMATION PLAN <br /> 1 INTRODUCTION <br /> Disturbed areas will be reclaimed to a post-mine land use of high-altitude rangeland. The <br /> disturbance area where a majority of buildings as well as historic waste rock and Tailings <br /> Storage Facilities are located, and the Atlas Access Road will be left for use by the <br /> landowner. Map F-1 (Exhibit F) shows the final reclamation topography and conditions of <br /> the site. Map C-6(Exhibit C) shows reclamation cross sections for the site. <br /> Table E-1 lists the total permit area broken down into following sub-areas: <br /> Table E-1 Disturbance Areas <br /> Description Area(acres) <br /> Disturbance Area <br /> Operations/Waste Rock 18.9 <br /> TSF (Atlas+RV) 9.7 <br /> Mine water mgt system 0.99 <br /> Revegetation Area 3.3 <br /> Disturbance Area Total 32.89 <br /> Wetlands 3.37 <br /> Undisturbed area 13.58 <br /> Shafts(3 shafts at.23 acres/shaft) 0.69 <br /> Total Permit Area 50.53 <br /> 2 RECLAMATION TIMETABLE <br /> The reclamation timetable below is based on the projections for the mine and the amount of <br /> reclamation that is needed after mine shutdown. Once the mine is permanently closed, <br /> reclamation is expected to take approximately 6 months. <br /> Exhibit E Reclamation Plan E-1 <br /> Technical Revision 11 <br /> September 2020 <br />