Laserfiche WebLink
OUR-A) Su FR AI/vEs <br /> VII. In the structures to remain post-reclamation, the removal of equipment/items within the <br /> structures is proposed. Please sped the equipment and or items required to remove the <br /> contents from all structures that are to remain post reclamation. <br /> OSMI Response: No specialized equipment will be needed to remove items within the <br /> structures that are to remain on site post reclamation. It is anticipated that a majority of the items <br /> will be removed by hand using a hand truck. Larger equipment may require forklifts,which are <br /> available on site. <br /> The number of hours expected to complete removal of equipment from buildings that will remain <br /> on site is 48 hours. <br /> VIII. Table L-2, Task 1 indicates a cost associated with the removal of the Diesel storage and <br /> filing station, however it is stated that it is a steel tank on skids. Please clarify if the cost is <br /> associated with the removal or disposal of the tanks. If it is for the disposal,please clam the <br /> disposal location. <br /> OSMI Response: The equipment will be sold back to the supplier. <br /> IX. Do the connex boxes associated with Tasks 9 and 16 of Table L-2 require a crane for <br /> removal? <br /> OSMI Response: The connex boxes do not require a crane for removal. <br /> The following comments were received on July 13, 2020 from Amy Yeldell (Environmental <br /> Protection Specialist)regarding Technical Revision 11 Adequacy Review—2 Bond Calculation. <br /> Demolition of permanent structures and removal of surface debris <br /> 1. DRMS Comment.During the inspection it was stated that all steel, wood and cement would <br /> be placed underground for final reclamation. Is onsite disposal already an approved permit <br /> condition?Please identify for each structure to be removed if it will be placed underground <br /> and in which portal. Or if off-site disposal is required. <br /> OSMI Response: Building materials slated for removal will be placed underground.Materials <br /> will first be placed in the mill and crusher gallery followed by the main portal area.No offsite <br /> disposal is expected with the exception of materials to be sold as scrap. <br /> 2. DRMS Comment.For the Underground Warehouse and Shop, what all needs to be <br /> removed?Provide the dimensions/volume of material. <br /> OSMI Response: As-builts for the underground warehouse and shop do not yet exist, as these <br /> facilities have not yet been constructed. Estimates of the final dimensions and volume of material <br /> 10 (Page <br />