Laserfiche WebLink
Task description: <br />Site: Seneca II -W Mine <br />PROJECT IDENTIFICATION <br />COST SUMMARY WORK <br />Permit Action: RN7 <br />Task #: 000 State: Colorado <br />Date: 7/29/2020 County: Routt <br />User: DCI <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Permit/Job#: C1982057 <br />Abbreviation: None <br />Filename: C057-000 <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />010 <br />020 <br />029 <br />030 <br />035 <br />039 <br />040 <br />041 <br />042 <br />043 <br />045 <br />050 <br />051 <br />054 <br />057 <br />058 <br />059 <br />060 <br />061 <br />069 <br />070 <br />072 <br />073 <br />074 <br />075 <br />076 <br />083 <br />084 <br />085 <br />Doze Adjacent South Wadge Pit Spoil Ridges <br />DOZER <br />4 <br />2 <br />4 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />110.63 <br />$2741217 <br />$121057 <br />$1341841 <br />$12,913 <br />$4,055 <br />$101852 <br />$101852 <br />$101852 <br />$221029 <br />$101021 <br />$1,014 <br />$44,038 <br />$58,876 <br />$675548 <br />$3,575 <br />$661409 <br />$391987 <br />$861639 <br />$121966 <br />$301984 <br />$1600 <br />$971590 <br />$1521084 <br />$1691977 <br />$1471750 <br />$1381906 <br />$1961894 <br />$711247 <br />$631445 <br />Rip Facilities Area <br />RIPPER <br />9.49 <br />Grade Culvert Embankments <br />DOZER <br />54.40 <br />Grade Haul Roads to Blend <br />GRADER <br />81.60 <br />Finish Grade All Mine Areas <br />GRADER <br />25.62 <br />Regrade Pond 009 <br />DOZER <br />31.76 <br />Regrade Pond 015 <br />DOZER <br />31.76 <br />Regrade Pond 016 <br />DOZER <br />31.76 <br />Regrade Pond 016a -completed but not bond <br />released <br />DOZER <br />64.48 <br />Regrade Pond 017 <br />DOZER <br />29.33 <br />Backfill and Regrade All Ditches <br />GRADER <br />6.40 <br />Replace Topsoil from Stockpile I to Shop and <br />Explosive Site <br />SCRAPERI <br />42.25 <br />Replace Topsoil from Stockpile I to Road A <br />SCRAPERI <br />31.41 <br />Replace Topsoil from Stockpile to Haul Road I <br />SCRAPERI <br />36.04 <br />Replace Topsoil from Stockpile BB to Road A <br />SCRAPERI <br />1.91 <br />Replace Topsoil from Stockpile to Raod A <br />SCRAPERI <br />35.43 <br />Replace Topsoil from Stockpile BB to Final Pit <br />Area <br />SCRAPERI <br />21.33 <br />Replace Topsoil from Stockpile C to Final Pit Area <br />SCRAPERI <br />46.22 <br />Replace Topsoil from Stockpile FF to Final Pit <br />Area <br />SCRAPERI <br />6.92 <br />Replace Topsoil from Stockpile TT to Permanent <br />Road J <br />SCRAPERI <br />16.53 <br />Replace Topsoil from Stockpile UU to Permanent <br />Road I <br />SCRAPERI <br />8.58 <br />Replace Topsoil from Stockpile WW to Final Pit <br />Area <br />SCRAPERI <br />52.06 <br />Replace Topsoil from Stockpile XX to Final Pit <br />Area <br />SCRAPERI <br />81.13 <br />Replace Topsoil from Stockpile YY to Haul Road <br />L <br />SCRAPERI <br />90.68 <br />Replace Topsoil from Stockpile YY to Final Pit <br />Area <br />SCRAPERI <br />78.82 <br />Replace Topsoil from Stockpile ZZ to Final Pit <br />Area <br />SCRAPERI <br />74.10 <br />Replace Topsoil from Stockpile AAA to Final Pit <br />Area <br />SCRAPERI <br />105.04 <br />Replace Topsoil from Stockpile DDD to Final Pit <br />Area <br />SCRAPERI <br />38.01 <br />Replace Topsoil from Stockpile EEE to Final Pit <br />Area <br />SCRAPERI <br />33.85 <br />