Laserfiche WebLink
SCRAPER TEAM WORK <br />Task description: Replace Topsoil from Stockpile I to Road A <br />Site: Seneca II -W Mine Permit Action: RN7 Permit/Job#: C1982057 <br />PROJECT IDENTIFICATION <br />Task #: 051 State: Colorado <br />Date: 7/27/2020 County: Routt <br />User: DCI <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT <br />Abbreviation: None <br />Filename: C082-010 <br />COSTShift basis: 1 per day <br />Equipment Description <br />-Scraper: Cat 637G w/push-pull <br />-Dozer: NA <br />Support Equipment -Load Area: NA <br />-Dum Area: NA <br />Road Maintenance —Motor Grader: CAT 14M <br />-Water Truck: Water Tanker, 10,000 Gal. <br />Cost Breakdown: Scraner Work Team Sunnort F(minment Maintenance Fouinment <br />Total work team cost/hour: $1,874.49 <br />MATERIAL OUANTITIES <br />Initial volume: 391939 CCY Swell factor: 1.000 <br />Loose volume: 39,939 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Saf <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Material weight: 2,100 lbs/LCY <br />Material description: Earth - Loam <br />Rated Payload: 81,600 pounds <br />Payload Capacity: 38.86 LCY <br />Scraper Bowl (volume, Basis: <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization -machine: <br />100 <br />NA <br />NA <br />NA <br />25 <br />25 <br />Ownership cost/hour: <br />$181.30 <br />NA <br />NA <br />NA <br />$65.89 <br />$73.77 <br />Operating cost/hour: <br />$203.87 <br />NA <br />NA <br />NA <br />$14.74 <br />$27.25 <br />%Utilization -ripper: <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ripper own. cost/hour: <br />NA <br />NA <br />NA <br />NA <br />$0.00 <br />$0.00 <br />Ripper op. cost/hour: <br />NA <br />NA <br />NA <br />NA <br />$0.00 <br />$0.00 <br />Operator cost/hour: <br />$30.90 <br />NA <br />NA <br />NA <br />$28.56 <br />$0.00 <br />Unit Subtotals: <br />$416.07 <br />NA <br />NA <br />NA <br />$109.19 <br />$101.02 <br />Number of Units: <br />4 <br />0 <br />0 <br />0 <br />1 <br />1 <br />Group Subtotals: <br />Work: <br />$104.28 <br />Support: <br />$0.00 <br />Maint: <br />$210.21 <br />Total work team cost/hour: $1,874.49 <br />MATERIAL OUANTITIES <br />Initial volume: 391939 CCY Swell factor: 1.000 <br />Loose volume: 39,939 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Saf <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Material weight: 2,100 lbs/LCY <br />Material description: Earth - Loam <br />Rated Payload: 81,600 pounds <br />Payload Capacity: 38.86 LCY <br />Scraper Bowl (volume, Basis: <br />Struck Volume: <br />24.00 <br />LCY <br />Heaped Volume: <br />34.00 <br />LCY <br />Average Volume: <br />29.00 <br />LCY <br />Adjusted Capacity: <br />29.00 <br />LCY <br />