Laserfiche WebLink
Cycle Time: <br />Scraper Loading Time: <br />Maneuver and Spread Time: <br />Job Condition Correction: <br />1.00 Minutes <br />0.60 Minutes <br />Scraper <br />Push Dozer <br />Source <br />Altitude Ad' : 0.980 <br />NA <br />(CAT HB) <br />Job Efficiency: 0.830 <br />NA <br />(CAT HB) <br />Site Altitude: 8000 feet <br />Net Correction: 0.813 NA <br />Travel Time: <br />Road Condition: Firm, smooth, rolling, dirt/It. surfaced, watered, maintained 3.0 <br />Haul Route <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />(%) <br />Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />(fpm) <br />Travel Time <br />(min) <br />1 <br />1200.00 <br />-8.50 <br />3.00 <br />-5.50 <br />2192 <br />0.64 <br />Haul Time: 0.64 minutes <br />Return Route: <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />(%) <br />Roll. Res <br />Total Res <br />(%) <br />Velocity <br />(fpm) <br />Travel Time <br />(min) <br />1 <br />1200.00 <br />8.50 <br />3.00 <br />11.50 <br />1327 <br />0.94 <br />Return Time: <br />Total Scraper team cycle time: <br />Adjusted for job conditions: <br />Selected Number of Scrapers: <br />Adjusted single scraper team (unit) hourly production: <br />Adjusted multiple scraper team (fleet) hourly production: <br />Unadjusted unit production/hour: 1,094.34 LCY/Hour <br />Optimal Number of Scrapers per push <br />dozer: <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) Total job time: <br />Unit cost: $1.172 /LCY Total job cost: <br />0.94 <br />minutes <br />3.18 <br />minutes <br />889.70 <br />LCY/Hour <br />2 <br />Scraper(s) <br />889.70 <br />LCY/Hour <br />889.70 <br />LCY/Hour <br />42.25 Hours <br />$44,038 <br />