My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-08-31_REVISION - C1982057
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1982057
>
2020-08-31_REVISION - C1982057
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2020 12:38:17 PM
Creation date
9/1/2020 7:56:41 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057
IBM Index Class Name
Revision
Doc Date
8/31/2020
Doc Name
Adequacy Review - Preliminary
From
DRMS
To
Seneca Property, LLC
Type & Sequence
RN7
Email Name
RAR
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BULLDOZER WORK <br />Task description: Doze Adjacent South Wadge Pit Spoil Ridges <br />Site: Seneca II -W Mine Permit Action: RN7 Permit/Job#: C1982057 <br />PROJECT IDENTIFICATION <br />Task #: 010 State: Colorado <br />Date: 7/27/2020 County: Routt <br />User: DC1 <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Cat DI IT - 11 U <br />Horsepower: <br />850 <br />Blade Type: <br />Universal <br />Attachment: <br />3 -shank ripper <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper own. <br />Cost/Hour: <br />Ripper op. Cost/Hour: <br />Operator Cost/Hour: <br />Total unit Cost/Hour: <br />Total Fleet Cost/Hour: <br />Abbreviation: None <br />Filename: C082-010 <br />$300.25 <br />Utilization % <br />NA <br />$250.88 <br />100 <br />$27.25 <br />NA <br />$0.00 <br />0 <br />$41.30 <br />NA <br />$619.68 <br />$2,478.73 <br />MATERIAL OUANTITIES <br />Initial Volume: 461,500 <br />Swell factor: 1.000 <br />Loose volume: 461,500 LCY <br />Source of estimated volume: <br />Source of estimated swell <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />Division of Reclamation, Mining & Safety <br />Cat Handbook <br />250 feet <br />1,264.9 LCY/hr <br />Materials consistency description: Loose stockpile 1.2 <br />Average push <br />gradient: <br />Average site altitude: <br />Material weight: <br />-15% <br />8,000 feet <br />2,550 lbs/LCY <br />Weight description: Sandstone <br />Job Condition Correction Factor <br />Source <br />Operator Skill: 0.750 <br />AVG. <br />Material consistency: 1.200 <br />CAT HB <br />Dozing method: 1.100 <br />(50% SL) <br />
The URL can be used to link to this page
Your browser does not support the video tag.