Laserfiche WebLink
Page 15 <br /> 7 Interim Management Plan <br /> The following discussion includes those topics that are pertinent to the planned operations. <br /> 7.1 Measures to Stabilize Excavations and Workings <br /> The exposed soil will be recontoured, scarified and reseeded or stabilized until revegetation is <br /> appropriate. If necessary, BMPs,tarps,filter fabric or straw will be used to stabilize exposed soils. <br /> Miners Mall will only complete final reclamation on an area when no further disturbance is planned in <br /> that area, but temporary stabilization measures will be applied during periods of non-operation to <br /> prevent erosion. A Storm Water Pollution Prevention Plan (SWPPP)will be prepared for the Project that <br /> will detail temporary and permanent BMPs that will be followed throughout the life of the Project. <br /> 7.2 Measures to Isolate or Control Toxic or Deleterious Materials <br /> There are no toxic or deleterious material associated with Project activities. There is no Spill <br /> Contingency Plan needed,as there will not be any fuels used within the Project Area. <br /> 7.3 Measures to Maintain the Project Area in a Safe and Clean Condition <br /> Miners Mall will conduct daily inspections of the Project Area. <br /> 7.4 Schedule of Anticipated Periods of Temporary Closure <br /> The mining activities will be performed on a seasonal and intermittent schedule that will vary based on <br /> biological constraints and weather. Seasonal factors include unusual large amounts of rain/snowfall. <br /> Biological factors will be added for any migrating/breeding wildlife. Miners mall will notify the BLM of <br /> their proposed schedule of operations and closures on an annual basis. <br /> 7.5 Temporary or Seasonal Closure <br /> As feasible, all disturbed areas will be reclaimed prior to temporary or seasonal closure. All equipment, <br /> tools, and supplies will be removed from the Project Area. The site will be left in a state that will not <br /> create hazards for the public or wildlife. Should temporary cessation of activities last for a period <br /> greater than 1 year, Miners Mall will transition into full reclamation of the Project Area. Final <br /> reclamation and reseeding will not be done on areas subject to future disturbance (i.e. Rock and Soil <br /> Stockpiles), but these areas will be stabilized using temporary BMPs to prevent erosion or <br /> sedimentation. <br />