Laserfiche WebLink
Page 13 <br /> 5.5 Measures to be taken during Extended Periods of Non-operation to Maintain the area in a Safe <br /> and Clean Manner and to Reclaim the Land to Avoid Erosion and Other Adverse Impacts. <br /> Miners Mall will notify the BLM in the event of a temporary closure of the mining activities and ensure <br /> that appropriate measures are taken to prevent erosion and sediment transport off-site. In the event <br /> that mining activities are interrupted due to unforeseen circumstances, interim reclamation will be <br /> initiated,as necessary. All erosion control measures and BMPs will be regularly inspected and <br /> maintained as described in the Project SWPPP. <br /> During periods of non-operation or seasonal closure,all equipment,tools and supplies will be removed <br /> from the Project Area. <br />