Laserfiche WebLink
Page 7 <br /> 3.5 Schedule of Operations <br /> Cursory visual inspection of the portal was conducted by the Miners Mall during the removal of a <br /> non-BLM padlock by the BLM. Mining related activities will commence, upon approval of the Plan <br /> amendment(C00079090)and acknowledgement of payment for bond increase by DRMS(M-2017- <br /> 035). <br /> Mining activities will be performed on a seasonal and intermittent schedule that will vary based on <br /> biological and weather conditions. Seasonal factors include unusual large amounts of rain/snowfall. <br /> Safety stand-downs will occur during inclement weather such as lightning storms and icing events. <br /> The estimated life span of the Project is approximately 5-9 years. All mining operations will be <br /> conducted during daylight hours. <br /> 3.6 Surface Disturbances <br /> Here is a break-down of surface disturbance within the Humming Bird claim: <br /> Description Type of Use Permitted PROPOSED Actual Subtotal <br /> Existing <br /> Disturbance <br /> Upper Working Open Stope 0.03 0.03 0.03 <br /> Mining <br /> Equipment Tool storage, 0.01 0.01 0.04 <br /> storage shade <br /> Waste Rock Reclamation 0.02 0.02 0.06 <br /> and Soil <br /> stockpile <br /> Upper Access Access 0.12 0.12 0.18 <br /> Road <br /> Total Existing 0.18 0.18 <br /> Proposed <br /> Disturbance <br /> Siberia Portal Underground 0.02 0.00 0.20 <br /> Mine <br /> Siberia Reclamation 0.02 0.00 0.22 <br /> stockpile and work area <br /> Lower Path Access 0.02 0.00 0.24 <br /> Proposed 0.06 <br /> Total <br /> Total 0.24 <br />