My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-08-25_REVISION - M1985135
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1985135
>
2020-08-25_REVISION - M1985135
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2024 12:26:24 AM
Creation date
8/25/2020 8:15:25 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1985135
IBM Index Class Name
Revision
Doc Date
8/25/2020
Doc Name
Correspondence
From
Larimer County Road & Bridge
To
DRMS
Type & Sequence
TR2
Email Name
AME
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
August 20, 2020 Aii] <br /> Horton Pit TR—Plan Updates <br /> Page 2 <br /> Ingress/egress for associated mining equipment, as well as mined/processed material will <br /> largely be along the south access road and through the south access gate. <br /> Reclamation Plan- <br /> Due to the inability to mine entirely through the property from the east to the west as in the <br /> original Mining Plan, the mining will leave two cells or pits. This will require the reclamation <br /> plan to change to allow drainage facilities for the two cells. Cell A (has been fully mined, and <br /> is in a state of unreleased reclamation) has a drainage pipe that leaves the cell in it's <br /> designed low point along the north side. Said drainage pipe proceeds northeast and outlets <br /> in a location that allows the discharge to disperse/fan across the northeast portion of the <br /> property. A typical of the Cell A drainage pipe has been submitted with this Technical <br /> Revision request (Exhibit A). The Cell A drainage pipe will remain as part of the reclamation <br /> of the property. <br /> As the mining of Cell B will cause a depression/pit/cell, a drainage pipe will be required there <br /> also. Said pipe will inlet at the lowest elevation of Cell B (at easternmost point), and drain to <br /> the west by southwest slope of Cell A. The design and construction of the drainage pipe will <br /> occur when needed/practicable— and before mining commences in Cell B. <br /> All slopes will be graded to 3'H:VV or flatter. Topsoil will be reserved for, and placed at a <br /> depth of no less than 2" on all regraded disturbed areas. <br /> All disturbed areas will be graded and covered with no less than 2" of topsoil, and then <br /> seeded, mulched/crimped and fertilized as per current reclamation plan and subsequent <br /> Technical Revisions. <br /> FOR <br /> I ARD ER <br /> COUNTY <br />
The URL can be used to link to this page
Your browser does not support the video tag.