My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-08-25_REVISION - M1985135
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1985135
>
2020-08-25_REVISION - M1985135
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2024 12:26:24 AM
Creation date
8/25/2020 8:15:25 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1985135
IBM Index Class Name
Revision
Doc Date
8/25/2020
Doc Name
Correspondence
From
Larimer County Road & Bridge
To
DRMS
Type & Sequence
TR2
Email Name
AME
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LARIMER COUNTY I ROAD AND BRIDGE <br /> 2643 Midpoint Drive,Suite C,Fort Collins,CO 80522 1970.498.5650 1 La rimer.org/roads <br /> RFf'71111.!c.® <br /> MEMORANDUM AUG ., � ?020 <br /> TO: Colorado Division of Reclamation, Mining and Safety DIVISIa,,:,.�RECu,- 110N <br /> tMING AND SAFETY <br /> FROM: Justin T Hersh, Larimer County Road and Bride <br /> DATE: August 18, 2020 <br /> RE: Horton Gravel Pit#1985-135 Technical Revision Mining/Reclamation Plan Updates <br /> As Larimer County has been in the process of submitting a request for a Technical Revision, <br /> it has become obvious that the current Mining and Reclamation Plans for Horton Gravel Pit <br /> need to be updated. The updates are as follows: <br /> Mining Plan — <br /> Due to the Sinclair Company buried petroleum line that bisects the property, mining <br /> operations will not disturb the ground above or around the pipeline. This has resulted in a <br /> plan to mine a separate cell (Cell B), rather than mining westward from the current mined <br /> area (Cell A). As the mining commences in Cell B, a drainage pipe will be installed (bored) <br /> from the lowest elevation in the southeast portion of Cell B to the western side/slope of Cell <br /> A. Said drainage pipe will be routed under the Sinclair Petroleum line. Coordination with <br /> Sinclair Oil Corporation for the design and construction of the drainage pipe will happen when <br /> practicable. <br /> Mining in Cell B will be a dry operation and happen in westward direction. Mining depths will <br /> be 35' to 50'. The cell slopes will be 3'H:1'V or flatter. <br /> Adequate topsoil for reclamation will be stockpiled largely in the form of berms between the <br /> required property line setbacks and the top/edge of mined area. <br /> Material processing (screening and/or crushing) will generally happen in the vicinity of the <br /> mining operation; processed material will be stockpiled until use just east of the <br /> mining/processing area. <br /> ANi=rrrY] <br />
The URL can be used to link to this page
Your browser does not support the video tag.