As of 05/14/09 <br />steel and plywood over the windows in the hoist house; installing steel bars and lock boxes on two doors in the hoist house, <br />repairing the grout around the collar of the shaft; installing bentonite and grout in the exploratory borehole. A total of six lock <br />boxes were installed at this site. Newmont installed their own locks on the boxes. This work was begun on July 28th, 2020 <br />and completed on July 31 st, 2020. <br /> <br />Remaining Reclamation Requirements and Estimated Cost <br />There are no further reclamation requirements for the site. <br /> <br /> <br /> <br />Julie_Annear____7/31/2020_____ ___________________________ <br />Project Manager Date Senior Project Manager Date <br /> <br />