My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-08-17_PERMIT FILE - P2004015
DRMS
>
Day Forward
>
Permit File
>
Prospect
>
P2004015
>
2020-08-17_PERMIT FILE - P2004015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2021 3:07:16 PM
Creation date
8/19/2020 10:55:42 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2004015
IBM Index Class Name
Permit File
Doc Date
8/17/2020
Doc Name
Closeout Report
From
Providence Mining
To
DRMS
Email Name
TCW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
As of 05/14/09 <br />Colorado Inactive Mine Reclamation Program <br />CLOSEOUT REPORT <br />Murphy NOIs Bond Forfeiture Project <br /> <br />Introduction: The Tenderfoot Hill NOI site is located in Section 7, Township 15S, Range 69W in Teller County, Colorado. A <br />Notice of Intent to Conduct Prospect Operations permit (P-2004-015) was issued to Providence Mining LLC (dba Murphy <br />Mining & Exploration, LLC) on November 5, 2004 . The permit was revoked on January 31, 2017 for failure to provide annual <br />reporting and fees. <br /> <br />The Carbonate Hill NOI site is located in Section 7, Township 15S, Range 69W in Teller County, Colorado. A Notice of Intent <br />to Conduct Prospect Operations permit (P -2005-005) was issued to Caldera Rim Mining Co. on April 27, 2005. The permit <br />was revoked on January 31, 2017 for failure to provide annual reporting and fees. Both sites are located on land now owned <br />by Newmont- Cripple Creek and Victor Mining Company (CC&V). <br /> <br /> <br />Permit Information <br />DRMS Permit Nos. <br />P-2004-015 (Tenderfoot <br />Hill), <br />P-2005-005 (Carbonate <br />Hill) <br /> <br />Operator Names <br />Providence Mining LLC dba <br />Murphy Mining & <br />Exploration, LLC <br /> <br />Mine Name <br />Carbonate Hill <br />Tenderfoot Hill <br /> <br />Type of Mine -Metal <br /> <br />Commodity Mined- Gold <br /> <br />Pre-Reclamation Site Conditions The project consists of two prospect locations which are: <br />1. Carbonate Hill 2. Tenderfoot Hill. The Carbonate Hill site contains a high wall on the north end of the prospect permit that <br />was not included in the mine permit area that was subsequently obtained. The Tenderfoot Hill site contains a two- <br />compartment mine shaft, hoist house and exploratory borehole. <br />Bidding/Construction Information <br />The project was bid in September 24, 2019. Construction work began on July 20 th, 2020 and was completed on July 31st, <br />2020 <br /> <br /> <br />Type of Bid Documented Quote <br />Project Number <br />2020-0158 <br /> <br /> <br />Contractor Name & Address <br /> <br />McCollum’s Excavating <br />P.O. Box 790 <br />Nederland CO 80466 <br /> <br /> <br />Construction <br />Dates <br /> <br />Start: July 20th, <br />2020 <br /> <br />Bond Amount <br />$ 6000 (Carbonate Hill) <br />$ 4000 (Tenderfoot Hill) <br />$ 38,050 (BF Severance Tax) <br />PO Date 3/13/2020 <br /> <br /> End: July 31st, <br />2020 <br />Project Cost <br />$48,050 <br /> <br />Construction Work Description <br /> <br />Construction began with a detailed on-boarding meeting the CC&V office in Cripple Creek, Colorado. The meeting detailed <br />safety protocols and procedures for conducting reclamation activities on CC&V property. Following the meeting, CC&V <br />personnel conducted a safety inspection of all equipment that would be used on site. McCollum ’s Excavating addressed all <br />noted safety concerns prior to beginning construction. <br /> <br />Carbonate Hill Mine: The project work included installing 275 linear feet of exclusion fence along the top of the high wall cut. <br />Construction began at this site on July 20 th, 2020. A berm was constructed on a portion of the access road at the top of the <br />high wall at the request of the CC&V safety manager. Following this, the exact location of the fence was laid out and fence <br />post holes were dug. Fence posts were grouted with concrete and the fencing wire was installed on July 27 th, 2020. The <br />disturbed areas around the high wall fence were seeded with a native seed mix. <br /> <br />Tenderfoot Hill Mine: Prior to beginning work, a hot work permit for welding was issued to McCollum’s excavating by CC&V. <br />The permit pertained to welding activities that were to be conducted at the Tenderfoot mine site. The project work included <br />the following: Safeguarding a portion of the manway shaft with a locking steel grate; installin g an expanded steel enclosure <br />over the top of the shaft; installing lock boxes on the shaft covers and the enclosure around the shaft; installing expanded
The URL can be used to link to this page
Your browser does not support the video tag.