Laserfiche WebLink
NEWMONT <br /> GOLDCORP <br /> various portions of the VLFs, discontinuing the addition of dilute sodium cyanide solution or make- <br /> up water, initiating detoxification operations, or other appropriate responses. <br /> CC&V currently inspects 15 leak detection system(LDS) locations on Arequa Gulch Valley Leach <br /> Facility (VLF1), and 3 LDS locations on Squaw Gulch Valley Leach Facility (VLF2) on a weekly <br /> basis. We Inspect 5 underdrains on VLF 1 &VLF 2 (SGVLF Underdrain, North Underdrain, South <br /> Underdrain, Phase 5 Underdrain, and Phase 4 underdrain), and 5 Low Volume Solution Collection <br /> Systems (LVSCS) on VLF 1 & VLF 2 (Phase 1 LVSCS, Phase 2 LVSCS, Phase 4 LVSCS, and <br /> Phase 5 LVSCS, VLF2 LVSCS). CC&V also inspects 5 High Volume Solution Collection Systems <br /> on VLF 1 & VLF 2 (VLF2 HVSCS, Phase 1 HVSCS, Phase 2 HVSCS, Phase 4 HVSCS, and <br /> Phase 5 HVSCS). See figure 3.3.1 for the monitoring locations on VLF1 and figure 3.3.2 for the <br /> monitoring locations on VLF2. <br /> Cripple Creek&Victor Gold Mining Company Exhibit G <br /> Cresson Project Amendment 13 <br /> 13 <br />