Laserfiche WebLink
captured and diverted to the upper diversion ditch and away from the pile. The water flow is <br />being closely monitored by the Operator to ensure it will not impact long term stability of the gob <br />pile. <br />• Inclinometer readings were provide for gob pile #2. The latest inclinometer readings indicate no <br />major movement since the last quarterly monitoring report. <br />• Vibrating wire piezometers readings were provided for gob pile #2. Pore pressure recordings have <br />remained consistent or with slight fluctuations expected during seasonal changes. <br />• No material has been placed on any of the gob piles and so compaction testing was not conducted <br />in the is` quarter of 2020. <br />I have no comments or concerns regarding the Bowie Resources, LLC's Bowie No. 2 Mine 2020 1St <br />Quarter Waste Bank Inspection Report. If you have questions, feel free to contact me. <br />Sincerely, <br />i <br />Zach Trujillo <br />Environmental Protection Specialist <br />(303) 866-3567 ext. 8164 <br />Zach.Trujillo@state.co.us <br />Pikeview Quarry Geotechnical Review Memo February 19, 2020 <br />