Laserfiche WebLink
Table D-1 - Typical Onsite Equipment <br /> Equipment Type Phase lQuantity i <br /> Excavator 1 <br /> Bulldozer 1 <br /> Water Truck 1 <br /> On-highway Dump Truck Varies with production <br /> Road Grader 1(occasionally) <br /> Loader 1 <br /> Fuel Tank — 1 <br /> Mobile Pump 1 <br /> A portable fuel tank will be set up in the mining area to supply equipment onsite. It will have full <br /> secondary containment. All equipment onsite will have onboard diesel tanks in full secondary <br /> containment. Full secondary containment has 110%of the volume of the tank that is in it. <br /> 2. General Mining Plan—Method of Mining <br /> Mining at the 23 '/a West Pit will be conducted in a single phase. Mining will be from south to <br /> north in Area 1 and west to east in Area 2. Maps C-2, C-3, and C-4 showing the extents of <br /> mining, a snapshot of mining roughly halfway through the mine's life, and cross sections of the <br /> mining and reclamation plans. The total disturbed area will be 41.4 acres. It is shown on Map C- <br /> 2. Crushing and screening of excavated material will take place onsite. Crusher fines may be <br /> placed in the lake during final reclamation or sold offsite as fill.No asphalt or concrete will be <br /> manufactured onsite. A truck scale and scale house will be installed onsite.No permanent plants <br /> of offices will be built onsite. <br /> Explosives will not be used at this site. <br /> 2_1 Mining Buffers and Limitations <br /> Throughout the mine life the setbacks shown on Map C-2 will be maintained.No mining will <br /> take place within the floodway,which is far off to the southwest. All mining will be within the <br /> floodplain, but no permanent fill will take place in this area. Stormwater control berms and <br /> stockpiles will be present during mining, but removed during reclamation. Additionally,the <br /> excavation of topsoil and overburden from the site will create storage volume for storm and <br /> flood events onsite. See Map G-1 and Exhibit G for more information on surface water <br /> management. <br /> 23 114 West D <br /> July 2020 -3 Grog I cwicl i and Associa(ty YI1.(' <br />