My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-08-11_PERMIT FILE - M2020035 (10)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2020035
>
2020-08-11_PERMIT FILE - M2020035 (10)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2022 8:31:53 PM
Creation date
8/12/2020 6:31:44 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2020035
IBM Index Class Name
PERMIT FILE
Doc Date
8/11/2020
Doc Name
Application
From
Elam Construction
To
DRMS
Email Name
ACY
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table D-1 - Typical Onsite Equipment <br /> Equipment Type Phase lQuantity i <br /> Excavator 1 <br /> Bulldozer 1 <br /> Water Truck 1 <br /> On-highway Dump Truck Varies with production <br /> Road Grader 1(occasionally) <br /> Loader 1 <br /> Fuel Tank — 1 <br /> Mobile Pump 1 <br /> A portable fuel tank will be set up in the mining area to supply equipment onsite. It will have full <br /> secondary containment. All equipment onsite will have onboard diesel tanks in full secondary <br /> containment. Full secondary containment has 110%of the volume of the tank that is in it. <br /> 2. General Mining Plan—Method of Mining <br /> Mining at the 23 '/a West Pit will be conducted in a single phase. Mining will be from south to <br /> north in Area 1 and west to east in Area 2. Maps C-2, C-3, and C-4 showing the extents of <br /> mining, a snapshot of mining roughly halfway through the mine's life, and cross sections of the <br /> mining and reclamation plans. The total disturbed area will be 41.4 acres. It is shown on Map C- <br /> 2. Crushing and screening of excavated material will take place onsite. Crusher fines may be <br /> placed in the lake during final reclamation or sold offsite as fill.No asphalt or concrete will be <br /> manufactured onsite. A truck scale and scale house will be installed onsite.No permanent plants <br /> of offices will be built onsite. <br /> Explosives will not be used at this site. <br /> 2_1 Mining Buffers and Limitations <br /> Throughout the mine life the setbacks shown on Map C-2 will be maintained.No mining will <br /> take place within the floodway,which is far off to the southwest. All mining will be within the <br /> floodplain, but no permanent fill will take place in this area. Stormwater control berms and <br /> stockpiles will be present during mining, but removed during reclamation. Additionally,the <br /> excavation of topsoil and overburden from the site will create storage volume for storm and <br /> flood events onsite. See Map G-1 and Exhibit G for more information on surface water <br /> management. <br /> 23 114 West D <br /> July 2020 -3 Grog I cwicl i and Associa(ty YI1.(' <br />
The URL can be used to link to this page
Your browser does not support the video tag.