My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-08-11_PERMIT FILE - M2020035 (10)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2020035
>
2020-08-11_PERMIT FILE - M2020035 (10)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2022 8:31:53 PM
Creation date
8/12/2020 6:31:44 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2020035
IBM Index Class Name
PERMIT FILE
Doc Date
8/11/2020
Doc Name
Application
From
Elam Construction
To
DRMS
Email Name
ACY
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Topsoil that is stripped and not required for the construction of the stormwater control berms will <br /> be immediately placed as part of contemporaneous reclamation, stockpiled on-site in the topsoil <br /> storage area, or shipped offsite to enhance reclamation at other Elam Construction sites. <br /> Temporary stockpiles of overburden or topsoil required for reclamation will typically be 20 feet <br /> in height. Temporary stockpiles will be located in the designated area shown on Map C-3. <br /> Because excavation will proceed to final mine slopes and grades of 3H:1 V or shallower(Map C- <br /> 3), it is anticipated that minimal backfilling with overburden will occur during reclamation. <br /> Overburden present on site will be stripped during mining and either placed directly on mined <br /> out ground as part of reclamation, stored in the stockpile area, or be sold as fill. Mining to final <br /> slopes and the direct placement of overburden onto reclamation slopes will reduce the need to <br /> stockpile overburden material and shorten the time that it will take to reclaim the mine. Details <br /> on topsoil and overburden quantities and material balance can be found in Table D-2 and Table <br /> E-2. <br /> 1_2 Mining Phases <br /> Mining will take place in a single phase. Once topsoil and overburden are stripped from the site, <br /> the deposit will be mined using shovels or loaders and haul trucks. The groundwater table is <br /> roughly seven feet below ground level based on Elam's experience at the 23 Road Pit adjacent to <br /> the west. Since groundwater will be exposed/encountered during mining,the entire pit will be <br /> dewatered using a pump. Details regarding this dewatering can be found in Exhibit G. <br /> Mining will progress in the dewatered pit as shown on Maps C-2 and C-3. All mining will be to <br /> final 3H:1 V slopes on the perimeter. The active mining highwall will be mined to the halfway <br /> point of the final 3H:1 V mining slope. This means that at no point in the operations life will <br /> backfill be required for reclamation; only highwall knock down will be needed to establish final <br /> slope. The maximum disturbance at any time will be at the end of the mine life when the largest <br /> lake is present and the largest amount of rangeland requiring topsoil and revegetation is present. <br /> This scenario will determine the bond calculation and is discussed in detail in Exhibit L. <br /> 1_3 Equipment <br /> Table D-1 shows the type of equipment that will be used for the operations of this site. Once <br /> operations are complete, all equipment will be removed from the site. <br /> 23 114 West <br /> .]lily 2020 D-2 � Greg t cwicki and.Associates PI.I.<' <br />
The URL can be used to link to this page
Your browser does not support the video tag.