Laserfiche WebLink
<br />Cripple Creek & Victor Gold Mining Company Exhibit D Cresson Project Amendment 13 2 <br />Processing higher grade, primarily sulfide ore from surface operations will continue through the High-Grade Mill (HG Mill). Processing of ore and mineralized waste material from surface operations will continue to occur through placement of ore on VLF2 per approved Technical Revision (TR) 104 (TR-104). Underground exploration of the Main Cresson Pit is anticipated to begin with the construction of a portal beginning in Q2 2020 (approved in TR-116). The current list of Technical Revisions is provided in Appendix 2. <br />The projected mine sequencing for the Cresson Project is included in the discussions below, although it is important to note that the rate of mining as well as other timelines presented herein are approximate and depend on anticipated production rates, mining fleet, crusher availability, gold price, gold recovery, and other factors, such as fuel prices and weather conditions. As such, these approximate timelines may change and result in a shorter or a longer overall mine life. Details are provided on pre-mining activities of clearing and grubbing, mining operation development including drilling and blasting, mine area stability designs, underground development work, loading and hauling, crushing and conveying, and overburden handling. The following sections also describe the construction, surface water handling, stability of the OSAs, and mine area backfilling. Haul road and access road specifications are described for those traffic routes that are within the mining areas.