My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-08-03_REVISION - M1980244 (8)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2020-08-03_REVISION - M1980244 (8)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2020 9:44:19 AM
Creation date
8/10/2020 8:29:31 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
8/3/2020
Doc Name Note
Exhibit D
Doc Name
Adequacy Review - Preliminary
From
CC&V
To
DRMS
Type & Sequence
AM13
Email Name
TC1
MAC
ERR
JPL
BFB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Cripple Creek & Victor Gold Mining Company Exhibit D Cresson Project Amendment 13 2 <br />Processing higher grade, primarily sulfide ore from surface operations will continue through the High-Grade Mill (HG Mill). Processing of ore and mineralized waste material from surface operations will continue to occur through placement of ore on VLF2 per approved Technical Revision (TR) 104 (TR-104). Underground exploration of the Main Cresson Pit is anticipated to begin with the construction of a portal beginning in Q2 2020 (approved in TR-116). The current list of Technical Revisions is provided in Appendix 2. <br />The projected mine sequencing for the Cresson Project is included in the discussions below, although it is important to note that the rate of mining as well as other timelines presented herein are approximate and depend on anticipated production rates, mining fleet, crusher availability, gold price, gold recovery, and other factors, such as fuel prices and weather conditions. As such, these approximate timelines may change and result in a shorter or a longer overall mine life. Details are provided on pre-mining activities of clearing and grubbing, mining operation development including drilling and blasting, mine area stability designs, underground development work, loading and hauling, crushing and conveying, and overburden handling. The following sections also describe the construction, surface water handling, stability of the OSAs, and mine area backfilling. Haul road and access road specifications are described for those traffic routes that are within the mining areas.
The URL can be used to link to this page
Your browser does not support the video tag.