(a) The operator/applicant will reclaim this mine site to Residential (RS) as the <br /> landowner has directed. <br /> Due to the natures of the mining activity as rock picking, much of the site will remain <br /> in similar condition as to the original state of the land, with exception of areas where <br /> vegetation has been removed to access the rock. The predominantly minimally <br /> disturbed areas where Ponderosa Pine forest still provides canopy over the ground <br /> will be graded as needed and otherwise left as is with existing soil and rocky floor. <br /> The anticipated 3-5 acres that are heavily disturbed and tree cover is removed, will <br /> be reclaimated as follows. <br /> The majority of the vegetation reclamation will be done by utility equipment and hydro <br /> seeding. Larger areas that have been compacted by the excavator and loader will be <br /> scarified by machine and then hydro seeded. The existing topography will not be <br /> altered in any way that would change the historical drainage of the stormwater. No <br /> sloping will be changed that would exceed a 3 horizontal to 1 vertical slope. All slopes <br /> will remain the same as they where pre-mining. Farm equipment may be employed to <br /> shape and seed the larger areas, to prepare the seedbed and grass seeding. The <br /> land shaping of the affected area will be done in such a manner as to enhance and <br /> blend with the surrounding topography. The permit area is to be seeded as per the <br /> NRCS seeding and planting plan as submitted. <br /> (b) As stated before the proposed post-mining land use will be Residential (RS). <br /> The area will be seeded and consistent with the surrounding lands. The reclaimed <br /> slopes will not exceed 3H:1V. The NRCS Reclamation plan will be implemented to <br /> the affected area. <br /> (c) A description of how the Reclamation Plan will be implemented. <br /> (i) The plant growth medium will not be changed from pre-mine conditions. Naturally <br /> occurring rocky soils will remain after the rock picking activity. <br /> (ii) Seeding will be done when the mining activity has been completed. The <br /> compacted areas will be loosened by using either by a disc or plowing <br /> dependent upon the amount of compaction. The rate of fertilizer will be 40 <br /> pounds per acre of nitrogen (N) and 10 pounds per acre of phosphorus (P), if <br /> it is the recommendation of the NRCS after testing. In addition, time of year <br /> and weather conditions will play a role in this timing. <br /> (iii) NRCS SEED RECOMMENDATIONS will be used as follows: <br />