My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-08-04_REVISION - M2011039
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2011039
>
2020-08-04_REVISION - M2011039
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 11:23:22 PM
Creation date
8/5/2020 12:16:24 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2011039
IBM Index Class Name
REVISION
Doc Date
8/4/2020
Doc Name
Request for Technical Revision
From
Premier Moss Rock
To
DRMS
Type & Sequence
TR1
Email Name
JPL
JLE
AWA
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
o4�oto <br /> COLORA„ TROI 1G AND SAFETY <br /> 1313 JPL/le i-3567 <br /> 1876* REQUEST FOR TECHNICAL REVISION (TR) COVER SHEET <br /> AW 0 4 2020 <br /> File No.: M- 201 1 039 Site Name: Premier MOSS Rock DMSIOi N NI OF RECLAMATION <br /> County P u e b I O TR# (DRMS Use only) <br /> Permittee: Premier MOSS Rock <br /> Operator(If Other than Permittee): <br /> Permittee Representative: N!C I` Simpson <br /> Please provide a brief description of the proposed revision: <br /> Revision to Reclaimation Plan which would change the plan to restore grounds to cover more <br /> No 3 <br /> As defined by the Minerals Rules, a Technical Revision(TR) is: "a change in the permit or application 6. <br /> a <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or c <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submittec N <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a Tl; <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <br /> to the permit. <br /> The request for a TR is not considered"filed for review"until the appropriate fee is received by the <br /> Division(as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee,the Division will <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve <br /> TR,you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies, the Division must deny the TR unless the <br /> permittee requests additional time, in writing,to provide the required information. <br /> There is no pre-defined format for the submittal of a TR; however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type-Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Type Required TR Fee Submitted(mark only one) <br /> I IOc, 111, 112 construction 0 <br /> materials, and 112 quarries $216 <br /> 112 hard rock(not DMO) $175 <br /> I IOd, 112d(1, 2 or 3) $1006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.