Laserfiche WebLink
Page 13 of 115 <br />SCRAPER TEAM WORK <br />Taskdescription: Haul/Regrade Spoil to Collom Haul Road: 282+00 -395+00 <br />Site: Colowyo Coal Mne Permit Action: 13C (TRI 18) Permit/Job#: C1981019 <br />PROJECT IDENTIFICATION <br />Task#: 006 State: Colorado Abbreviation: None <br />Date: 3/13/2018 County: Moffat Filename: C019-006 <br />User: ZTT <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT <br />COSTShift basis : lamer day <br />Description <br />-scraper: t -at b3 /u wi usn- tut <br />-Dozer: NA <br />Support Equipment -Load Area: NA <br />-Dump Area: CatD11T - 11U <br />Road Maintenance —Motor Grader: CAT 16M <br />-Water Truck: Water Tanker, 5,000 Gal. <br />C.nstRreakdnwn- Scraner Work Team SunnortEauinment MaintenanceEauinment <br />Totalworkteam cost/hour $4,438.29 <br />MATERIAL OUANTITIES <br />Initial volume: 292,294 CCY Swell factor: 1.125 <br />Loosevolume: 328,831 LCY <br />Source ofes timated volume: Table 7 Ext. 13B -T-20 <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Material weight: <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />MotorGrader <br />Water Truck <br />%Utilization -machine: <br />100 <br />NA <br />NA <br />65 <br />25 <br />25 <br />Ownership cost/hour: <br />$152.84 <br />NA <br />NA <br />$226.13 <br />$72.40 <br />$24.01 <br />Operating cost/hour: <br />$158.39 <br />NA <br />NA <br />$119.54 <br />$14.49 <br />$8.53 <br />%Utilization -ripper: <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ripperown. cost/hour: <br />NA <br />NA <br />NA <br />$0.00 <br />$0.00 <br />$0.00 <br />Ripperop. cost/hour: <br />NA <br />NA <br />NA <br />$0.00 <br />$0.00 <br />$0.00 <br />Operator cost/hour: <br />$31.26 <br />NA <br />NA <br />$41.85 <br />$28.90 <br />$0.00 <br />Unit Subtotals: <br />$342.49 <br />NA <br />NA <br />$387.51 <br />$115.79 <br />$32.54 <br />Numberof Units: <br />8 <br />00 <br />4 <br />1 <br />1 <br />Group Subtotals: <br />Work: <br />$2,739.92 <br />Support: <br />$1,550.04 <br />Maint: <br />$148.33 <br />Totalworkteam cost/hour $4,438.29 <br />MATERIAL OUANTITIES <br />Initial volume: 292,294 CCY Swell factor: 1.125 <br />Loosevolume: 328,831 LCY <br />Source ofes timated volume: Table 7 Ext. 13B -T-20 <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Material weight: <br />2,6501bs/LCY <br />Materialdescription: <br />Decomposed rock -25% Rock, <br />75% Earth <br />Rated Payload: <br />81,600 pounds <br />Payload Capacity: <br />30.79 LCY <br />Scraper Bowl (volume) Basis: <br />Struck Volume: 24.00 LCY <br />Heaped Volume: 34.00 LCY <br />Average Volume: 29.00 LCY <br />Adjusted Capacity: 29.00 LCY <br />CIRCES Cost Estimating SoSware <br />