My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-05-18_PERMIT FILE - C1981019A (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981019
>
2020-05-18_PERMIT FILE - C1981019A (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2020 5:28:39 PM
Creation date
8/4/2020 2:06:35 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019A
IBM Index Class Name
Permit File
Doc Date
5/18/2020
Doc Name
Cumulative Bond Schedule
Type & Sequence
MR215
Section_Exhibit Name
Volume 20 Exhibit 13C
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
166
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cycle Time: <br />Scraper Loading Time: <br />Maneuver and Spread Time: <br />Job Condition Correction: <br />1.00 Minutes <br />0.60 Minutes <br />I I Scraper I Push Dozer I Source I <br />Job Efficiency: 1 0.830 1 NA I (CAT HB) <br />Net Correction: I 0.830 I NA <br />Travel Time: <br />Road Condition: Hard, smooth. stabilized, surfaced watered. maintained 2.0 <br />HaulRoute: <br />Page 12 of 115 <br />Site Altitude: 7500 feet <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />(%) <br />Roll. Res <br />(%) <br />1 <br />Total Res <br />(%) <br />1 <br />Velocity <br />000) <br />1 <br />Trawl Time <br />(min) <br />1 <br />1 <br />4290.00 <br />0.80 <br />2.00 <br />2.80 <br />2800 <br />1.80 <br />HaulTime: 1.80 minutes <br />Return Route: <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />(%) <br />Roll. Res <br />%) <br />Total Res <br />(%) <br />1 <br />Velocity <br />001n) <br />Trawl Time <br />(min) <br />1 <br />4290.00 <br />-0.80 <br />2.00 <br />1.20 <br />2963 <br />1.57 <br />Return Time: <br />1.57 <br />minutes <br />Total Scraper team cycle time: <br />4.97 <br />minutes <br />Adjustedforjob conditions: <br />581.17 <br />LCY/Hour <br />Selected Number of Scrapers: <br />2 <br />Scraper(s) <br />Adjustedsinglescraper team (unit)hourly production: <br />581.17 <br />LCY/Hour <br />Adjusted multiple scraper team (fleet) hourly production: <br />2,324.67 <br />LCY/Hour <br />Unadjustedunitproduction/hour: 700.20 LCY/Hour <br />Optimal Numberof Scrapers perpush dozer: <br />JOB TIME AND COST <br />Fleet size: 4 Team(s) <br />Unitcost: $1.941 /LCY <br />Totaljobtime: 215.09 Hours <br />Totaljob cost: $970,437 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.