My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-08-03_INSPECTION - C1982057
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1982057
>
2020-08-03_INSPECTION - C1982057
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 11:13:05 PM
Creation date
8/3/2020 10:13:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057
IBM Index Class Name
Inspection
Doc Date
8/3/2020
Doc Name
OSM Inspection Report
From
OSM
To
DRMS
Inspection Date
7/21/2020
Email Name
RAR
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mine Site Inspection <br /> Mine Name: Seneca II-W Mine <br /> Permittee: Seneca Property, LLC <br /> Permit ID#: # C-1982-057 <br /> Inspection Date: July 21, 2020 <br /> Time: 7:30—4:20 <br /> Inspection Type: SL-6 and 7 Phase II & III Bond Release Inspection <br /> Weather Conditions: Hot(80's - 90's), clear skies, dry ground <br /> Participants: <br /> Christine Belka: Office of Surface Mining Reclamation and Enforcement(OSMRE) #182 <br /> Miranda Kawcak, Seneca Property, LLC <br /> Ana Lash: Hayden Public Library <br /> Robin Reilley: Division of Reclamation Mining and Safety (DRMS) <br /> Christine Epp: Hayden Public Library <br /> Background/General Information <br /> Seneca 11-W is a non-producing, surface coal mine in Routt County in permanent cessation <br /> status. Buildings,parking areas, access roads,ponds, and shrub plot fencing within the permit <br /> area remain intact and are approved to remain as permanent structures at the landowners' <br /> request. <br /> This was a partial Phase II and III bond release inspection associated with the sixth and seventh <br /> bond release applications at the Seneca 11-W Mine, referred to as SL-6 and SL-7. The SL-6 <br /> application requests combined Phase II/III release on 379.5 acres and Phase III release on 437.1 <br /> acres. The SL-7 application requests Phase III release on 367 acres. The Hayden Public Library <br /> owns part of the land currently proposed for release, and two Library representatives attended <br /> their land's portion of the inspection. No other landowners were present, although all were <br /> notified and provided the opportunity to attend. <br /> Rule: 4.03: Roads <br /> All un-reclaimed roads travelled were in good repair. Retained roads are approved to remain <br /> permanently at the landowners' request. Permanent roads have been reduced from their original <br /> size and are in good repair. No problems were noted with road surfacing or drainage. <br /> Rules: 4.05.5 and 4.05.6: Sediment Control Measures and Sedimentation Ponds <br /> Parcel 10, stock pond T-3 is stable and functioning as intended. Water was inflowing to and <br /> discharging from Pond 16 during the inspection. Large catfish inhabit the pond. Pond T-27 was <br /> holding water but not discharging. Surge tanks in Parcel 154 were dry. <br /> The culvert running under the access road along the border of Parcels 61 and 13 is partially <br /> clogged and dented. This requires repair and clean-out. <br /> A large (approximately 1' wide and 1.5' deep, 150' long)rill has formed between Ponds T-5 and <br /> T-6 in Parcel 22 and should be repaired according to Seneca Property, LLS's approved rill and <br /> 1 1 Pa g e <br />
The URL can be used to link to this page
Your browser does not support the video tag.