Laserfiche WebLink
U.S. DEPT. OF THE INTERIOR <br /> OFFICE OF SURFACE MINING <br /> Mine Site Evaluation <br /> Permittee/ Permit Field Visit State Program <br /> Person sENEc a PROPERTY 11 C Number C-82-057 Date 7/21/2020 <br /> Continuation Page <br /> 28. Performance Standard Categories <br /> Codes:l=Compliance,2=Noncompliance,3=Not Planned,4=Not Started,5=Noncompliance Identified Elsewhere,6=Previously Cited,7=Permit Defect <br /> A. Administrative D. Backfilling&Grading H. Subsidence Control Plan <br /> 1. Mining within Valid Permit 1. Exposed Openings I. Roads <br /> 2. Mining within Bonded Area 2. 1 Contemporaneous Reclamation 1. 1 Road Constriction <br /> 3. ] Terms&Conditions of Permit 3. 1 Approximate Original Contour 2. Certification <br /> 4. Liability Insurance 4. 1 Highwall Elimination 3. 1 Drainage <br /> 5. Ownership and Control 5. Steep Slopes(includes downslope) 4. 1 Surfacing and Maintenance <br /> 6. Temporary Cessation 6. Handling of Acid and Toxic Materials 5. 1 Reclamation <br /> 7. AML Rec.Fees-Non-Respondent 7. 1 Stabilization(rills and gullies) J. Signs&Markers <br /> 8. AML Rec.Fees-Failure to Pay E. Excess Spoil Disposal 1. 1 Signs <br /> B. Hydrologic Balance 1. Placement 2. 1 Markers <br /> l. 1 Drainage Control 2. Drainage Control <br /> 2. Inspections&Certifications 3. Surface Stabilization K. Distance Prohibitions <br /> 3. 1 Siltation Strictures 4. Inspections&Certifications L. Revegetation <br /> 4. 1 Discharge Structures <br /> 5. 1 Diversions F. Coal Mine Waste 1. 1 Vegetative Cover <br /> 6. Effluent Limits (Refuse Piles/Impoundments) 2. 1 Timing <br /> 7. Ground Water Monitoring 1. Drainage Control M. 1 Postmining Land Use <br /> 2. Surface Stabilization <br /> 8. Surface Water Monitoring 3 Placement <br /> N. Other <br /> 9. Drainage Acid Toxic Materials 4. Inspections&Certifications General <br /> 10. 1 Impoundments <br /> 5. Impounding Structures Performance <br /> H. Stream Buffer Zones Category <br /> C. Topsoil&Subsoil G. Use of Explosives <br /> 1. Removal 1. Blaster Certification <br /> 2. Substitute Materials 2. Distance Prohibitions <br /> 3. Storage and Protection 3. Blast Survey/Schedule <br /> 4. 1 Redistribution 4. Warnings&Records <br /> 5. Control of Adverse Effects <br /> Performance Standard Categories E. Excess Spoil Disposal r8161817.71-74) <br /> 30 CFR Counterparts I. Placement. 71(e) <br /> A. Administrative...............................__..............___-_-__.____......_............. 2. Drainage Control- 71(f) <br /> 1. Valid Permit- 773-11 3. Surface Stabilization. 71(g) <br /> 2. Nfniingvctithin3 ended Area ---- 77311 4. Inspections&Certification. 71(h) <br /> 3. Terms&Conditions of Permit 773-17 F. Coal Kline Waste(Refuse Pileampoundments) 9161817.91-84) <br /> 4. Liabilitc Insurance 80060 1. Drainage Control 83(a) <br /> 5. ORnership and Cantrol 778.13 2. Surface Stabilization 83(b) <br /> 6. Temporary Cessation 842-11(e)&816'817.131 3. Placement 93(c) <br /> 7. ANIL Rec.Fees-Non-Respondent 8 7 0.15(b) 4. Inspections and Certifications 83(d) <br /> 8. ANILRec.Fees-FailuretoPay 870.15(a) 5. Impounding Structures------------------ 84 <br /> B. Hydrologic Balance (816/817.41-57) G. Use of Explosives (916/817.61-68) <br /> 1. Drainage Control 45 1. Blaster Certification ------------------------------- 61(c) <br /> 2. Inspections&Certifications, 49(a)(10) 2. Distance Prohibitions 61(d) <br /> 3. Siltation Strui 46 3. Blast Sun ev Schedule 62 64 <br /> 4. Discharge Structures 47 4. Warnings ix Records 66&6S <br /> 5. Diversions - 43 7. Control of Adverse Effects 67 <br /> 6. Effluent Limits ------------ 42 H. Subsidence Control Plan (817.121-122) <br /> 7. Groundkrt'aterMonitoring ----------41{c) I. Roads (S16/817.150-1*1) <br /> S. Surface Water Monitoring -- ------------41(e) <br /> 9. Drainage-Acid-Toxic Materials ---------------------------------41(f) 1. Road Construction 150(c) <br /> 14. Impoundments -------------------------------------- 49 2. Certification----- 151(a) <br /> 11. Stream Buffer Zone s 57 3. Drainage ------- 15-1!) <br /> C. Topsail&Subsoil (8161817.22) 4. Surfacing mid Maintenance 159(e)-151(d) <br /> 1. Removal 22(a) 5. Reclamation 159(f) <br /> 2. Substitute Materials. 22(c) J. Signs&Nlarkers 8161817.11) <br /> 3. Storage and Protection 22(c) 1. Signs 11(a).(b),&(c) <br /> 4. Redistribution 22(d) 2. Markers 11(a),(b):(d)(e),&:(f) <br /> P.Backfi ing&Grading 816/517.95-107) K- Distance Prohibitions (761.11) <br /> 1. Exposed Openings U&S 17.13,14,15,&823.11&21 L. Rev egetation (816/817.111-116) <br /> 2_ CarrtemporaneousReclamation 100 1. Vegetative Cover 111&116 <br /> 3- Approximate Original Cori our 102(axl) 2 Timing 113 <br /> 4- Highcvall Elimination-- 102(a)(2) N . Postmining Land Use (8161817.113) <br /> 5_ Steep Slopes(includes donnslope) 107 <br /> 6. Handling of Acid&Toxic Materials 1.02(c) <br /> Stabilization rills and es 95 <br /> OSM Action Off-Site Impacts <br /> 1)Deferred to State Action 6)ID-CO Issued(Imminent Danger to Public) For each type of impact and resource affected,enter page 2 of 2 <br /> 2)TON Issued 7)Previously cited by RA,abatement pending "N,D,or J"to describe the degree of off-site impact: <br /> 3)NOV Issued 8)Abated during or before OSM Inspection N-Minor Occurrence <br /> 4)FTA-CO Issued 9)Follow-up of Federal Action D-Moderate Occurrence raevised 0-ber 1,2010 <br /> 5)IH-CO Issued 0)Off-site impact with no violation J-Major Occurrence <br />