Laserfiche WebLink
22 July 2020 C-1994-082/Yoast Mine RAR <br />Photo 9: Constructed drainage YPM7 <br />Number of Partial Inspection this Fiscal Year: 1 <br />Number of Complete Inspections this Fiscal Year: 0 <br />highwall parcels 63 and 64 and <br />descending through parcels 64, 74, <br />84, proceeding up through the <br />parcels around Pond 12 including <br />parcels 77, 82 and 79. <br />Vegetation comprised a diversity of <br />species apropos to the seed mixture <br />and constructed drainages were in <br />good condition and functioning <br />appropriately. Constructed drainage <br />YPM7 (pictured left), flows through <br />parcels 78 and 82 and appeared well <br />armored amongst the vegetation <br />comprised mostly of diverse grasses. <br />