Laserfiche WebLink
and as soon mining sequence extract gypsum from lowest bench; we will back fill it with <br /> overburden. Lowest three benches have 7 acres footprint with almost 1million st storage <br /> capacity. <br /> Lower grades are expected from Titanium Hill, mining sequence will include blending <br /> procedure with medium and high grade gypsum from Quarry North and South by 2023, <br /> overburden dump for initial production will be in place, later 2021, near Titanium hill, then <br /> overburden will be transported and back fill quarry North and South lower benches, if is <br /> needed. <br /> Acres <br /> Overburden areas 16 <br /> Quarry North and South 28 <br /> Titanium quarry 9 <br /> Additional areas 3 <br /> 55 <br /> 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 <br /> Quarry north side <br /> Quarry south side <br /> Titanium Hill <br /> Mining <br /> Reclamation <br /> 5 <br />