Laserfiche WebLink
Exhibit C- Mining Plan <br /> a) Mining completed 9/1/2007. This submittal is only for a reclamation plan. <br /> b) This site has been converted to industrial/commercial gravel yard and will be in <br /> accordance with the recent approval from the City of Grand Junction Special Use Permit. <br /> c) There is no overburden of waste rock. Mining completed 9/1/2007. This submittal is <br /> only for a reclamation plan. <br /> d) No rock will be deposited for this application. Mining completed 9/1/2007. This <br /> submittal is only for a reclamation plan. <br /> e) Mining completed 9/1/2007. This is for reclamation only and there will be no <br /> components of mining with this application. <br /> f) This site has been converted to industrial/commercial gravel yard and will be in <br /> accordance with the recent approval from the City of Grand Junction Special Use Permit. <br /> Please see Exhibit C C2 Map for proposed grading. <br /> g) There are no mining roads. Dimensions of roads are shown on the exhibits. Roads were <br /> recently rebuilt with black base/recycled asphalt to alleviate dust concerns. <br /> h) No water will be used. This submittal is only for a reclamation plan. <br /> i) This submittal is only for a reclamation plan and a stormwater quality pond will be built <br /> in accordance with the recent approval from the City of Grand Junction Special Use <br /> Permit application. <br /> j) The proposed stormwater quality pond will meet the requirements of the approved <br /> Stormwater Management that was recently approved. <br /> k) No refuse acid, or toxic producing materials will be exposed. Mining completed <br /> 9/1/2007. This submittal is only for a reclamation plan. <br /> 1) Mining completed and focus is now on reclamation of disturbed areas. <br /> m) There will not be deposits processed on-site. Mining completed 9/1/2007. This <br /> submittal is only for a reclamation plan. <br /> n) There will be no primary or secondary commodities to be mined or extracted. Mining <br /> completed 9/1/2007. This submittal is only for a reclamation plan. <br /> o) There will be no incidental products mined/extracted. Mining completed 9/1/2007. This <br /> submittal is only for a reclamation plan. <br /> p) There will be no explosives used in conjunction with reclamation and mining was <br /> completed 9/1/2007. <br />