My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-07-22_REVISION - M1981148
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1981148
>
2020-07-22_REVISION - M1981148
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 10:42:12 PM
Creation date
7/23/2020 8:02:51 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981148
IBM Index Class Name
REVISION
Doc Date
7/22/2020
Doc Name
Request for Technical Revision
From
General Shale Brick
To
DRMS
Type & Sequence
TR3
Email Name
ECS
MAC
AWA
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
00 0, <br /> General <br /> Building The American Dream* <br /> Clay Stockpile Pad gees <br /> When mining is complete tie clay stockVilte pad areas wi,11 be covered with a dust suppressant <br /> such as Coher x magnesium chloride,l r simi,lar material. If General Shale determirves dust, <br /> suppressants, are not cost effecti. e grog or similar gravel material, will be laid down .the, <br /> stockpile pad area floor In, stockpile areas were the pad areas are sta,111,qg to, grow grass <br /> tac ffiie will be utilized to minfMize, dint until a good stand f g ass i,s established. <br /> Duet bate �nt Plan Dorm Pe fMining <br /> Access Road <br /> '17he recycled asphalt pavement (RAP) w l be monitored-for dust., f yeas become dusty or are <br /> missing, then,additional RAP will be added, to the access road. <br /> Vehicle speeds will, be posted, at, 15 mph. <br /> Stockpiles <br /> Tops Topsoll and, overburden-ins e rdeg stockpi'1e will be monitored for weeds and the amount of <br /> . ass growing <br /> weeds, overseeding, fertilizing, blanketing, applying tackifier etc® ant a good stem of grassis <br /> established. <br /> Clay stlockpiles, will be monitored for dust. If't 10j"ound the surface crusting is not effective r <br /> wind erosion a tack ier wi.11 be applied to the clay stock Ile. <br /> Clay oc ,i%l .Areas <br /> s the clay stockpiles are consumed, the exposed stockpile pad area floor of the clay stockpile <br /> pad areas its e covered witha dust suppressant such as Coherex, magnesium <br /> slitn'llar material. I f n r ] Shade determines dust suppressants,is are not cost f ctt' e, grog, or <br /> slixii1ax gravel ma erial will, down on.the e exposed, areas of the stockpile pad area, <br /> 1 r. t should be noted that the clays stockpile pad area floor within 50feet of the clay <br /> stock le face ill �Y t e treated because this 's t nor � �� f th st � ��� n � ace <br /> treatments for dust wIll be ineffective n these areas. <br /> n r ll Shale, , 5 els Dartmouth Avenue,Denver Colorado 80110, Page, <br />
The URL can be used to link to this page
Your browser does not support the video tag.