My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-07-22_REVISION - M1981148
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1981148
>
2020-07-22_REVISION - M1981148
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 10:42:12 PM
Creation date
7/23/2020 8:02:51 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981148
IBM Index Class Name
REVISION
Doc Date
7/22/2020
Doc Name
Request for Technical Revision
From
General Shale Brick
To
DRMS
Type & Sequence
TR3
Email Name
ECS
MAC
AWA
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
001 0 <br /> Gener, aij, Shale <br /> Building The AmeI c lea <br /> Dust Abatement Plan During f Mining Activity <br /> Heavy Equipment Traffic <br /> f practical prior to the staff m n ; the recycled asphalt pavement e P Erom the maill <br /> access,road will be salvaged, stockpiled spread back out on the access road post mining <br /> campaign when mining is complete. <br /> Any wash brick located on the ro�ads, ditches or clay stockpile pad, areas wfll be salvaged and <br /> reused .fpractical in roads,, stockp e pad areas,, and ditches. <br /> When clay is mined from the pit the primary dust concern l dust generated from heavy <br /> equipment traffic Eroni the pit to the product stockpile. <br /> water truck will be kept onsite and utilized, as often as, necessary, in ze ffigitive dust <br /> generated fog heavy equipment traffic roadways. <br /> St <br /> oc le a areas d other open,,areas meted � i"nimi e d � hesareas,., <br /> Water will be obtained, o the mine ihocs awellem , ell der <br /> through the state en i per"s office. <br /> Heavy equipment see .s will, reduced h us presents an ISISUe Until the water truck can <br /> reduces d .s . <br /> ii ugh win,d events that last more than I hour and fugitive dust leaving e prq <br /> boundary, the mining operation, i empor it suspended until the high winds slow <br /> 71'he inn .e i on. may, continue if the water trod can keep with the fugitive dustduring <br /> is high -wind, event. <br /> Stockpile <br /> When.mining is,complete, h topsoil and overburaen-interburden stockpile ilk be seeded with <br /> the permlitted topso,11seed, ni x u In the sprm& fall or winterif frost is got an issue. 'The <br /> s o k will �e covered with, tic ifer or grog (offly o�n, slopes located interior mine <br /> to rninim. ize dust untilsuitable stand -asp established. ifthe stockpile(s) are completed <br /> during e summer or when seeding 's impractical 1: stockpile(s) will be covered with tackifier <br /> r (only n,slopes located interiorto the one) to m i lip. dust and.then seeded in the next, <br /> a v <br /> aable growing season. <br /> Clay stockpiles,will not be seeded to minimize vegetation contamination into the raw, Material. <br /> flowever, it is most likely, that e clay, stockpiles, the longer 1 occur site, will es li.sl�. <br /> ass,on, -ace crust that protects <br /> them from wind erosion. <br /> General ale, 1845 West,DartmouthAvenue,Denver Colorado 80110 Pa <br />
The URL can be used to link to this page
Your browser does not support the video tag.