My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-07-20_REVISION - M1977342 (5)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977342
>
2020-07-20_REVISION - M1977342 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 10:38:24 PM
Creation date
7/21/2020 8:46:21 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977342
IBM Index Class Name
REVISION
Doc Date
7/20/2020
Doc Name
Geotechnical Stability Analysis Report
From
Climax Molybdenum
To
DRMS
Email Name
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A=COM <br /> Mr. Ron Hickman <br /> Henderson Mill <br /> July 15, 2020 <br /> Page 3 <br /> were used to refine the fine tailings extent and to confirm pore pressure conditions. The CPT <br /> investigation showed that the fine tailings material located on the northern side of the original <br /> 3 Dam buttress are isolated and confirmed pore pressure conditions. An updated 2D post- <br /> earthquake loading stability analysis was completed on design section 4A with the updated <br /> fine extents. This analysis was completed using the same procedures described in the 3 Dam, <br /> Phase II Buttress Design letter report dated June 1, 2020. Figure 4 presents the updated slope <br /> stability analysis results for post-earthquake loading condition which meets the stability <br /> criteria. As a result, the proposed regrade or slope flattening of the northern original 3 Dam <br /> buttress is no longer required. Remainder of the design remains consistent with the 3 Dam <br /> Phase II submission. <br /> CLOSING REMARKS <br /> We hope this document helps clarifies any concerns the DRMS has with the Phase II 3 Dam buttress <br /> design. In addition, the DRMS should continue to take comfort that Freeport has taken the initiative <br /> to have a Technical Review Board of tailings dam experts review the design. <br /> Sincerely, <br /> 0 -e— <br /> A"�� a-, <br /> Lisa Yenne, P.E. Richard R. Davidson, P.E. <br /> Project Manager Vice President and Principal <br /> Engineer <br /> cc: File <br /> Attachments: <br /> Figure 1 <br /> Figure 2 <br /> Figure 3 <br /> Figure 4 <br /> C\USERS\ZANA KARIMI\DOCUMENTS\HENDERSON STABUMDRMS PH 11 RESPONSE FINAL DOCX <br />
The URL can be used to link to this page
Your browser does not support the video tag.