My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-07-20_REVISION - M1977342 (5)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977342
>
2020-07-20_REVISION - M1977342 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 10:38:24 PM
Creation date
7/21/2020 8:46:21 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977342
IBM Index Class Name
REVISION
Doc Date
7/20/2020
Doc Name
Geotechnical Stability Analysis Report
From
Climax Molybdenum
To
DRMS
Email Name
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A=COM <br /> Mr. Ron Hickman <br /> Henderson Mill <br /> July 15, 2020 <br /> Page 2 <br /> 4:1(horizontal to vertical). Steeper benches are constructed as part of normal operations as <br /> the impoundment steps upstream. These benches serve as access routes during operation <br /> until the following upstream step is constructed. A schematic showing the design slope and <br /> benches is provided in Figure 1. These benches are regularly graded as part of erosion and <br /> storm water control measures and are considered standard maintenance of the impoundment. <br /> The overall slope of 4:1 provides embankment stability and this slope is maintained during <br /> any bench regrading activities. <br /> DRMS Comment 2 <br /> Please provide additional discussion and stability results for the 3 Dam Phase II buttress design <br /> under static conditions to ensure a minimum factor of safety of 1.5 is met as stated under Section 30. <br /> AECOM Response 2 <br /> Steady-state drained loading conditions represents the long-term stability of the dam. <br /> Stability analyses were performed on the design section, Sections 2 and 4A, with the <br /> designed Phase II buttress and crest elevation of 8,887 ft under steady-state (static) loading <br /> conditions using the drained shear strengths shown on Figures 2 and 3. The limit <br /> equilibrium computer program UTEXAS4 (Wright, 2008) and Spencer's method of slices <br /> were used for the stability analyses. Spencer's method satisfies all conditions of static <br /> equilibrium, including horizontal and vertical force imbalance and moment imbalance. <br /> Search routines available within UTEXAS4 were used for circular and noncircular trial shear <br /> surfaces to locate critical shear surfaces. The results of the two-dimensional (213) limit <br /> equilibrium steady state drained factor of safety for Section 2 is 2.5 and for Section 4A is 2.1. <br /> Figures 2 and 3 show resulting failure surfaces for Section 2 and 4A, respectively. <br /> DRMS Comment 3 <br /> It is stated under the cover page for the proposed TR-32 application that a geotechnical <br /> investigation was scheduled for June 2020 which could potentially result in minor modifications to <br /> the geometry of the buttress. Please provide additional details of the June 2020 investigation (if <br /> occurred) and whether this investigation will have an impact on the currently proposed Phase II 3 <br /> Dam buttress design. <br /> AECOM Response 3 <br /> A Cone Penetration Test (CPT) field investigation consisting of 14 CPTs with pore pressure <br /> dissipation tests was completed in the original 3 Dam buttress area June 2 to 5, 2020. The <br /> CPTS ranged in depth from 10 to 20 ft to the natural ground. Results from the CPT program <br /> C\USERS2ANA KARIMI\DOCUMENTS\HENDERSON STABILrrY\DRMS PH 11 RESPONSE FINAL DOCX <br />
The URL can be used to link to this page
Your browser does not support the video tag.