A=COM <br /> Mr. Ron Hickman <br /> Henderson Mill <br /> July 15, 2020 <br /> Page 2 <br /> 4:1(horizontal to vertical). Steeper benches are constructed as part of normal operations as <br /> the impoundment steps upstream. These benches serve as access routes during operation <br /> until the following upstream step is constructed. A schematic showing the design slope and <br /> benches is provided in Figure 1. These benches are regularly graded as part of erosion and <br /> storm water control measures and are considered standard maintenance of the impoundment. <br /> The overall slope of 4:1 provides embankment stability and this slope is maintained during <br /> any bench regrading activities. <br /> DRMS Comment 2 <br /> Please provide additional discussion and stability results for the 3 Dam Phase II buttress design <br /> under static conditions to ensure a minimum factor of safety of 1.5 is met as stated under Section 30. <br /> AECOM Response 2 <br /> Steady-state drained loading conditions represents the long-term stability of the dam. <br /> Stability analyses were performed on the design section, Sections 2 and 4A, with the <br /> designed Phase II buttress and crest elevation of 8,887 ft under steady-state (static) loading <br /> conditions using the drained shear strengths shown on Figures 2 and 3. The limit <br /> equilibrium computer program UTEXAS4 (Wright, 2008) and Spencer's method of slices <br /> were used for the stability analyses. Spencer's method satisfies all conditions of static <br /> equilibrium, including horizontal and vertical force imbalance and moment imbalance. <br /> Search routines available within UTEXAS4 were used for circular and noncircular trial shear <br /> surfaces to locate critical shear surfaces. The results of the two-dimensional (213) limit <br /> equilibrium steady state drained factor of safety for Section 2 is 2.5 and for Section 4A is 2.1. <br /> Figures 2 and 3 show resulting failure surfaces for Section 2 and 4A, respectively. <br /> DRMS Comment 3 <br /> It is stated under the cover page for the proposed TR-32 application that a geotechnical <br /> investigation was scheduled for June 2020 which could potentially result in minor modifications to <br /> the geometry of the buttress. Please provide additional details of the June 2020 investigation (if <br /> occurred) and whether this investigation will have an impact on the currently proposed Phase II 3 <br /> Dam buttress design. <br /> AECOM Response 3 <br /> A Cone Penetration Test (CPT) field investigation consisting of 14 CPTs with pore pressure <br /> dissipation tests was completed in the original 3 Dam buttress area June 2 to 5, 2020. The <br /> CPTS ranged in depth from 10 to 20 ft to the natural ground. Results from the CPT program <br /> C\USERS2ANA KARIMI\DOCUMENTS\HENDERSON STABILrrY\DRMS PH 11 RESPONSE FINAL DOCX <br />