Laserfiche WebLink
Page 2 of 245 <br /> 068 Rip N Pit Haul Roads RIPPER 4 5.38 $8,556 <br /> 072 Rip East A Haul Roads(East A and East A Split) RIPPER 4 2.96 $4,706 <br /> 074 Rip Access Road(Tasks 042-061) RIPPER 4 3.11 $4,943 <br /> 075 Rip K Pit Haul Roads(KMain,Kl,K2 ,K3) RIPPER 4 2.12 $3,375 <br /> 076 Rip K Pit Haul Roads(TR106) RIPPER 4 3.37 $5,357 <br /> 080 Regrade Coyote Impoundment DOZER 2 288.69 $210,379 <br /> 081 Regrade Middle Pyeatt Impoundments DOZER 1 51.73 $18,847 <br /> Impoundment(1,2,3) <br /> 082 Regrade Far East Buzzard Impoundment DOZER 1 0.56 $205 <br /> 083 Regrade Sage Impoundments(1 and 2) DOZER 1 18.91 $6,891 <br /> 084 Regrade West Horse Impoundment DOZER 1 3.52 $1,281 <br /> 085 Regrade Impoundment H DOZER 1 7.29 $2,654 <br /> 086 Regrade Industrial Waste Pond DOZER 1 7.47 $2,722 <br /> 087 Regrade Deal 1 and 2 DOZER 1 9.83 $3,843 <br /> 088 Regrade Deacon 1,2 and Jeffway 1,2 DOZER 1 94.72 $37,036 <br /> impoundments <br /> 089 Regrade Diversions DOZER 1 26.98 $7,119 <br /> 090 Replace Topsoil on Ash Pits SCRAPERI 1 64.45 $273,435 <br /> 091 Replace Topsoil on D/E Pits SCRAPERI 1 209.68 $889,505 <br /> 092 Replace Topsoil on Z Pits SCRAPERI 1 53.06 $225,084 <br /> 093 Replace Topsoil on F Pit Area SCRAPERI 1 38.60 $163,741 <br /> 094 Replace Topsoil on G Pit Area Including K-Pit SCRAPERI 1 499.36 $2,118,425 <br /> 096 Replace Topsoil at West Panel,BC rd, Shop SCRAPERI 1 113.54 $481,650 <br /> 097 Replace Topsoil at East Panel Ponds,A road SCRAPERI 1 170.98 $725,355 <br /> 098 Re-topsoil Johnson Coal Stockpile SCRAPERI 1 3.66 $15,516 <br /> 100 Facilities Area REVEGE 1 75.00 $36,376 <br /> 101 Roads(includind BC road)below 6700' REVEGE 1 196.00 $95,209 <br /> 103 Ponds below 6700'(Coyote, Sage,FE Buzzard) REVEGE 1 26.00 $12,610 <br /> 104 Johnson Coal Stockpile REVEGE 1 6.00 $3,153 <br /> 105 topsoil piles below 6700' REVEGE 1 27.00 $13,144 <br /> 107 Roads:>6700 ft.-Rangeland with Shrubs REVEGE 1 54.00 $43,391 <br /> 108 Ash pit.-Rangeland with Shrubs REVEGE 1 87.00 $71,730 <br /> 109 Seed D/E Pit Range B REVEGE 1 29.60 $12,946 <br /> III Ponds above 6700'(deasl,deacons,jeffways,west REVEGE 1 19.00 $14,979 <br /> horse) <br /> 112 topsoil piles above 6700' REVEGE 1 5.00 $4,083 <br /> 113 Shrub Clump Tansplant(14 at$11086 per NA 1 40.00 $155,204 <br /> operator) <br /> 114 Seed D Pit Range A-B REVEGE 1 204.60 $213,799 <br /> 115 Seed Z Pit Range A-B REVEGE 1 190.20 $152,267 <br /> 116 Seed Z Pit Range A-B REVEGE 1 190.20 $152,267 <br /> 117 Seed G Pit Range A-B REVEGE 1 600.59 $480,810 <br /> 118 Seed H Pit REVEGE 1 207.10 $90,579 <br /> 119 Seed KLM Pits, 154 Acre additional bond REVEGE 1 77.00 $123,287 <br /> coverage TR115 <br /> 120 Seal 16 Boreholes(MR212) BOREHOLE 1 24.00 $32,059 <br /> 121 Seal 20 Developmental Drill Holes BOREHOLE 1 111.00 $43,755 <br /> 122 Seal Monitoring Wells BOREHOLE 1 74.00 $70,075 <br /> 123 Sealing Stations 1-4 BOREHOLE 1 6.24 $5,445 <br /> 124 Seal 4 Monitoring Wells(MR217) BOREHOLE 1 6.24 $27,185 <br /> 125 Seal GLEV-1,GLEV-2 and GLEV-3 Wells BOREHOLE 1 4.00 $2,239 <br /> 126 Seal Monitoring Well 95-LW9(MR223) BOREHOLE 1 7.00 $3,938 <br /> 127 Sealing CY-1,CY-2,CY-3 (MR225) NA 1 8.00 $7,422 <br /> 128 Reveg for 20 x.3 acres drillholes REVEGE 1 6.00 $4,803 <br /> 129 Regrade .3acres x 20 drill pads DOZER 1 60.58 $15,986 <br /> 130 Demolish structures,remove materials and debris DEMOLISH 1 100.00 $727,348 <br /> 131 Culvert Removal and Disposal DEMOLISH 1 60.00 $155,011 <br />