Page I of 245
<br /> COST SUMMARY WORK
<br /> Task description: PR 09 site wide update
<br /> Site: Trapper Mine Permit Action: PR9 Permit/Job#: C1981010
<br /> PROJECT IDENTIFICATION
<br /> Task 4: 000 State: Colorado Abbreviation: None
<br /> Date: 6/17/2020 County: Moffat Filename: COIO-000
<br /> User: TNL
<br /> Agency or organization name: DRMS
<br /> TASK LIST(DIRECT COSTS)
<br /> Task Form Fleet Task
<br /> Description Used Size Hours Cost
<br /> 001 Ash Disposal Pit Regrade(NW section) DOZER 2 40.79 $29,744
<br /> 002 Ash Disposal Pit Regrade(Section 1 SW) DOZER 2 7.98 $5,819
<br /> 002B Ash Disposal Pit Regrade(Section 1 NE) DOZER 2 111.33 $81,188
<br /> 003 Ash Disposal Pit Regrade(Section 2 SW) DOZER 2 181.34 $132,239
<br /> 003B Ash Disposal Pit Regrade(Section 2 N) DOZER 2 364.32 $265,669
<br /> 004 Regrade Johnson Coal Stockpile DOZER 1 22.76 $8,299
<br /> 030 Regrade BC Road DOZER 4 72.55 $105,732
<br /> 031 Regrade D-Main Road DOZER 4 53.06 $77,337
<br /> 032 Regrade East and West Ash Roads DOZER 4 87.61 $127,685
<br /> 033 Regrade LOM Roads DOZER 4 158.24 $230,625
<br /> 034 Regrade A Roads(Middle A and North A N pit) DOZER 4 58.27 $84,921
<br /> 035 Regrade N Pit Roads(old LOM,cross-over,ash DOZER 4 20.26 $48,011
<br /> pit)
<br /> 039 Regrade East A Haul Roads(East A and East DOZER 4 67.82 $98,839
<br /> ASplit,BridgeRd)
<br /> 041 Regrade K Pit Haul Roads(Kl EPRL K3) DOZER 4 64.71 $94,313
<br /> 042 Regrade Mine Access Road DOZER 4 23.58 $34,360
<br /> 043 Regrade Explosive Storage Access Road DOZER 4 5.72 $8,329
<br /> 044 Regrade No Name Access Roads 42,44,5R DOZER 4 14.38 $20,965
<br /> 045 Regrade Potable Water Well Access Road DOZER 4 1.79 $2,603
<br /> 046 Regrade West Pyeatt Access Road(1 and 2) DOZER 4 7.14 $10,412
<br /> 047 Regrade Middle Pyeatt Access Road(1,2 and 3) DOZER 4 6.61 $9,631
<br /> 048 Regrade East Pyeatt Access Road(1,2 and 3) DOZER 4 8.75 $12,755
<br /> 049 Regrade Grouse Access Road DOZER 4 4.57 $6,664
<br /> 050 Regrade West Flume Access Road DOZER 4 2.68 $3,905
<br /> 051 Regrade East Flume Access Road DOZER 4 2.68 $3,905
<br /> 052 Regrade Deal Access Road DOZER 4 2.68 $3,905
<br /> 053 Regrade Horse Access Roads(Horse and Horsel) DOZER 4 6.07 $8,850
<br /> 054 Regrade West Horse Access Road DOZER 4 2.68 $3,905
<br /> 055 Regrade Middle Flume Access Roads(1,2 and 3) DOZER 4 6.92 $10,090
<br /> 056 Regrade Oak Access Roads DOZER 4 3.39 $4,946
<br /> 057 Regrade Sage Access Roads DOZER 4 4.46 $6,507
<br /> 058 Regrade Johnson Access Road DOZER 4 11.07 $16,139
<br /> 059 Jeffway Access Road DOZER 4 10.44 $15,222
<br /> 063 Rip BC Walk Road RIPPER 4 2.24 $3,565
<br /> 064 Rip D Pit Haul Roads(D1,D3,D4,D5 and RIPPER 4 8.40 $13,357
<br /> Dmain)
<br /> 065 Rip West Ash Haulroads(West Ash,West Ashl RIPPER 4 5.98 $9,507
<br /> and West Ash 2)
<br /> 066 Rip LOM Haul Roads(F2 and F2-G5) RIPPER 4 8.76 $13,927
<br /> 067 Rip A Pit Haul Roads(Middle A and North A) RIPPER 4 6.43 $10,220
<br />
|