Laserfiche WebLink
Attachment 2.05.3(3)-34 Engineering Office Alternate Sediment Control Effluent Demonstration <br /> Attachment 2.05.3(3)-35 Pond 018 As-Built <br /> Attachment 2.05.3(3)-36 Pond 016 As-Built <br /> Attachment 2.05.3(3)-37 Alternate Sediment Control Demonstration on GW46 Trust Property <br /> Attachment 2.05.3(3)-38 Goforth Stock Pond Design (SP1) <br /> Attachment 2.05.3(3)-39 Elk Ridge Mining & Reclamation Stock Pond Design (SP2) <br /> LIST OF MAPS <br /> Map 2.05.3(3)-1 Surface Water Hydrology <br /> Map 2.05.3(3)-1-2 Post Mine Surface Water Hydrology <br /> Map 2.05.3(3)-3 Utility Location <br /> Map 2.05.3(3)-5-1 Pond 009 As-Built <br /> Map 2.05.3(3)-8 Lincoln Haul Road <br /> Map 2.05.3(3)-12-1 Pond 012 Design <br /> Map 2.05.3(3)-12-2 Pond 012 Design <br /> Map 2.05.3(3)12-3 Pond 012 Dam <br /> Map 2.05.3(3)-12-4 Pond 012 As-Built <br /> Map 2.05.3(3)-15 Pond 015 Design <br /> Map 2.05.3(3)-18 Pond 013 Design <br /> Map 2.05.3(3)-19 Pond 015 As-Built <br /> Map 2.05.3(3)-20 Pond 015 As-Built Ditches and Culverts <br /> Map 2.05.3(3)-21 Trench Drain Design <br /> Attachment 2.05.3(3)-28, Map 1 Pond 018 Watershed Boundaries & Hydrologic Curve Numbers <br /> Attachment 2.05.3(3)-28, Map 2 Pond 018 Plan View and Design Details <br /> Attachment 2.05.3(3)-30, Map 1 Postmining Drainage Analysis Pond 009 Area <br /> Attachment 2.05.3(3)-31, Map 1 Postmining Drainage Analysis Pond 012 Area <br /> Attachment 2.05.3(3)-32, Map 1 Postmining Drainage Analysis Pond 013 Area <br /> Map 2.05.3(3)-33 Postmining Drainage Analysis Pond 015 Area <br /> Map 2.05.3(3)-35 Pond 018 As-Built <br /> Map 2.05.3(3)-36 Pond 016 As-Built <br /> Map 2.05.3(3)-36-1 Pond 016 Drainage Area <br /> Figure 2.05.3(3)-37 Alternate Sediment Control GW46 Trust Property <br /> Map 2.05.3(3)-38 Goforth Stock Pond Design (SP1) <br /> Map 2.05.3(3)-39 Elk Ridge Mining & Reclamation Stock Pond Design (SP2) <br /> Section 2.05.3(3) Page 2 July 2020 (TR-99) <br />