My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-07-13_REVISION - C1981008 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981008
>
2020-07-13_REVISION - C1981008 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2020 8:41:58 AM
Creation date
7/13/2020 8:37:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
Revision
Doc Date
7/13/2020
Doc Name
Adequacy Review Response
From
Elk Ridge Mining and Reclamation, LCC
To
DRMS
Type & Sequence
TR99
Email Name
JHB
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE OF CONTENTS <br /> A. Introduction......................................................................................................................... 3 <br /> B. Sediment and Water Control Facilities Plan....................................................................... 3 <br /> C. Collection Ditches, Culverts and Diversion Design Parameters ........................................ 4 <br /> D. Designs for All Ditches in the Permit Area........................................................................ 5 <br /> E. Sedimentation Ponds 009 through 018 Design Parameters................................................ 6 <br /> Table 2.05.3(3)-1 Surface Hydrology Curve Numbers .................................... 10 <br /> Table 2.05.3(3)-2 Sediment Pond Design - Soils Information* ...................... 11 <br /> Dam Classification Criteria............................................................................................... 12 <br /> F. Alternative Sediment Control Measures........................................................................... 13 <br /> G. Discharge Structures......................................................................................................... 13 <br /> H. Lincoln Street Haul Road.................................................................................................. 13 <br /> Drainage............................................................................................................................ 14 <br /> Surfacing........................................................................................................................... 14 <br /> Maintenance...................................................................................................................... 14 <br /> Reclamation ...................................................................................................................... 14 <br /> I. Access Roads.................................................................................................................... 14 <br /> J. Light-Use Roads ............................................................................................................... 14 <br /> K. Support Facilities .............................................................................................................. 14 <br /> Buildings........................................................................................................................... 14 <br /> Table 2.05.3(3)-3 Building Inventory................................................................... 15 <br /> WasteWater...................................................................................................................... 15 <br /> DomesticWater ................................................................................................................ 16 <br /> SolidWastes...................................................................................................................... 16 <br /> FuelStorage...................................................................................................................... 16 <br /> Support Facilities and Utility Installations ....................................................................... 16 <br /> Relocation of the CCC West Lateral Ditch....................................................................... 17 <br /> LIST OF ATTACHMENTS <br /> Attachment 2.05.3(3)-1 Collection/Diversion Ditches and Culverts Design Parameters <br /> Attachment 2.05.3(3)-5 Pond 009 As-Built <br /> Attachment 2.05.3(3)-8 County Agreement and Montrose County Road Easement Agreement <br /> Attachment 2.05.3(3)-12 Sediment Pond 012 Engineering Design <br /> Attachment 2.05.3(3)-13 Pond 012 As-Built <br /> Attachment 2.05.3(3)-15 Pond Slope Stability Analyses <br /> Attachment 2.05.3(3)-17 Permanent Structure Letters <br /> Attachment 2.05.3(3)-24 Pond 015 As-Built <br /> Attachment 2.05.3(3)-26 Trench Drain Design <br /> Attachment 2.05.3(3)-28 Pond 018 Sediment Control System <br /> Attachment 2.05.3(3)-29 Pond 016 Postmining SEDCAD Modeling <br /> Attachment 2.05.3(3)-30 Pond 009 Postmining SEDCAD Modeling <br /> Attachment 2.05.3(3)-31 Pond 012 Postmining SEDCAD Modeling <br /> Attachment 2.05.3(3)-32 Pond 013 Postmining SEDCAD Modeling <br /> Attachment 2.05.3(3)-33 Pond 015 Postmining SEDCAD Modeling <br /> Section 2.05.3(3) Page 1 July 2020 (TR-99) <br />
The URL can be used to link to this page
Your browser does not support the video tag.