Laserfiche WebLink
embankment. During normal conditions, the valve will be left slightly open to provide 24- <br /> hour detention time for each pond during the large events. This is accounted for as weep <br /> holes in the SEDCAD design runs. For Ponds 012 and 013, SEDCAD analysis has shown <br /> that the effluent from a slightly open valve still meets effluent requirements. For these <br /> ponds,the operator can decide to leave the valve cracked or shut as described above. <br /> d. Appropriate combinations of principal and emergency spillways to safely contain or <br /> discharge the runoff from a 25-year, 24-hour or larger precipitation events, as required by <br /> the DRMS's regulations, will be installed. If a pond is designed to contain the runoff from <br /> a 25-year, 24-hour or larger event, an emergency spillway will still be installed. <br /> e. Pond freeboard will be a minimum of 1.0 feet from the highest level of water allowed in <br /> the pond(or emergency spillway)to the top of dam. <br /> f. The top of dam width will be at least 10 feet in all areas. <br /> g. All ponds except Pond 018 will have a keyway cut along the entire width of the dam. This <br /> keyway will be filled with competent material and compacted to the same standards as the <br /> dam foundation. <br /> h. All principal spillways will have 2 anti-seep collars installed within the dam which will be <br /> at least 2x the pipe diameter. All dam fill will be compacted around the anti-seep collars <br /> and principal spillway pipe to 90% of the maximum dry density of the fill material. <br /> i. Attachment 2.05.3(3)-15 demonstrates that the given materials on site have been tested for <br /> suitability in constructing pond embankments and that the long term slope safety factors <br /> exceed 1.3 in all cases, given the pond design parameters outlined above and in the <br /> Attachment. For this reason, no individual slope stability analyses are presented for the <br /> ponds. The exception to this being Ponds 016 and 018 for which individual slope stability <br /> analyses have been provided. <br /> Tables 2.05.3(3)-1 and 2.05.3(3)-2 list the values of CN and "k" for different soil and vegetation <br /> types. The tables have been revised to address new soils found in the area west of 2700 Road. The <br /> curve number(CN) and "k" factor for each of the ponds is determined as a weighted average. The <br /> undisturbed area curve number and "k" factor information is based on the soils and vegetation <br /> information found within Sections 2.04.9 and 2.04.10, respectively, of the New Horizon Mine <br /> permit application. <br /> The pond volumes are calculated by first using the Curve Number and Runoff Routine within the <br /> Hydrology module of Carlson Software and then using the USLE sediment storage routine within <br /> the Hydrology module of Carlson Software. The LS factors for the USLE are determined from the <br /> 3D CAD grid model of the drainage areas for each pond. The water volume is determined from <br /> the weighted average CN for the watershed based on the worst case conditions over the life of the <br /> mine and the appropriate design storm rainfall. Curve numbers used are from 78 to 90 based on <br /> the existing conditions, level of disturbance and the hydrologic soil type of each watershed. Once <br /> the required volume of sediment and storm inflow is known, these two are combined to get the <br /> Section 2.05.3(3) Page 7 July 2020 (TR-99) <br />