Laserfiche WebLink
E. Sedimentation Ponds 009 through 018 Design Parameters <br /> In accordance with Rule 4.05.2, Ponds 009 through 018 will be used to prevent, additional <br /> contributions of sediment to stream flow or runoff outside the permit area due to mining <br /> disturbance. The pond designs and or run-off calculations for the sedimentation ponds are shown <br /> below: <br /> Pond Attachment Maps <br /> Pond 009 Attachment 2.05.3(3)-5 Map 2.05.3(3)-5-1 <br /> Attachment 2.05.3(3)-30 Attachment 2.05.3(3)-30, Map 1 <br /> Pond 012 Attachment 2.05.3(3)-12 Map 2.05.3(3)-12-1 <br /> Attachment 2.05.3(3)-13 Map 2.05.3(3)-12-2 <br /> Attachment 2.05.3(3)-31 Map 2.05.3(3)-12-3 <br /> Map 2.05.3(3)-12-4 <br /> Attachment 2.05.3(3)-31, Map 1 <br /> Pond 013 Attachment 2.05.3(3)-32 Map 2.05.3(3)-32 <br /> Pond 015 Attachment 2.05.3(3)-22 Map 2.05.3(3)-15 <br /> Attachment 2.05.3(3)-24 Map 2.05.3(3)-19 <br /> Attachment 2.05.3(3)-33 Attachment 2.05.3(3)-33, Map 1 <br /> Pond 016 Attachment 2.05.3(3)-29 Attachment 2.05.3(3)-29, Map 1 <br /> Attachment 2.05.3(3)-29, Map 2 <br /> Attachment 2.05.3(3)-36 Map 2.05.3(3)-36 <br /> Pond 018 Attachment 2.05.3(3)-28 Attachment 2.05.3(3)-28, Map 1 <br /> Attachment 2.05.3(3)-28, Map 2 <br /> Attachment 2.05.3(3)-28, Map 3 <br /> Attachment 2.05.3(3)-35 Map 2.05.3(3)-35 <br /> Pond 013 will remain for some time after the reclamation of the surrounding land but will not be <br /> permanent. Map 2.05.3(3)-1 shows the locations of all ponds. The sedimentation ponds are <br /> designed, constructed and maintained as follows: <br /> a. Ponds 009, 012, and 013 have been designed to contain the 25-year, 24-hour event with no <br /> discharge from the emergency spillway. Ponds 015, 016, and 018 have been designed for <br /> a 100-year, 24-hour event with no discharge. <br /> b. The sedimentation ponds are designed to provide adequate sediment storage volume in <br /> compliance with the DRMS regulations. Actual designs are based on a minimum 3 year <br /> sediment volume based on USLE calculations. Actual construction may cut more volume <br /> below the dam level (incised storage)to lessen expensive cleanout during the operation. <br /> c. The principal spillway design is typically an 18-24" diameter CMP or other pipe which <br /> will have a valve on the entrance (see as-built for specific sizes). This pipe will be stopped <br /> down in the inlet side to a 6" valve which will be controlled by a wheel on the pond <br /> Section 2.05.3(3) Page 6 July 2020 (TR-99) <br />