My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-07-08_REVISION - M1980244 (21)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2020-07-08_REVISION - M1980244 (21)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2025 2:35:35 AM
Creation date
7/9/2020 8:15:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
7/8/2020
Doc Name
VOL 2-Phase 2A, Part 3(1 OF 2)
From
CC&V
To
DRMS
Type & Sequence
TR122
Email Name
TC1
MAC
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
269
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Newmont-Cripple Creek&Victor Gold Mine <br /> Technical Specification No.02200 REV D <br /> Squaw Gulch VLF . <br /> Project No.475.0106.006 <br /> March 13,2020 <br /> compacted Bedding Fill becomes overly wet due to precipitation or over watering, <br /> CONTRACTOR shall allow the wet soil to dry to the specified moisture content range <br /> before recompaction of fill and placement of geosynthetic materials. <br /> 3. CONTRACTOR shall assist CQA Monitor in obtaining soil samples for CQA testing. <br /> Bedding Fill sampling shall be scheduled by CQA Monitor with CONTRACTOR to <br /> facilitate CQA field testing. <br /> 4. CONTRACTOR shall trim the surface of the Bedding Fill to the design grades shown <br /> on the DRAWINGS. <br /> S. CONTRACTOR shall roll the surface of the Bedding Fill with a smooth drum roller to <br /> remove ridges and surface irregularities greater than 0.5 inches in height. <br /> CERTIFYING ENGINEER shall determine if surface preparation is sufficient to place <br /> geomembrane. On areas with slopes steeper than 3H:1V, CONTRACTOR shall adopt <br /> methods as necessary to obtain the same final surface preparations that would be <br /> obtained by the passage of a smooth-drum roller on flat or level ground. Pushing of <br /> compaction equipment by tracked equipment shall not be performed. Wheel ruts on <br /> the surface of the Bedding Fill from grading equipment shall be repaired by <br /> CONTRACTOR prior to placement of the geomembrane by rolling the surface as <br /> approved by CQA Monitor. CONTRACTOR shall take whatever steps necessary to <br /> prepare Soil Liner Fill surface to the satisfaction of MANAGER and CERTIFYING <br /> ENGINEER, at no additional cost to CC&V. <br /> 6. CONTRACTOR shall maintain the Bedding Fill surface in a condition suitable for <br /> geomembrane installation as specified in these SPECIFICATIONS and in the CQA Plan <br /> until the surface is covered. CONTRACTOR shall repair all weather related damage to <br /> Bedding Fill surfaces or other portions of the Work that have or have not been <br /> covered by geomembrane, at no additional cost to CC&V. <br /> If any moisture is allowed to collect under the geomembrane prior to or after final <br /> seaming and softens the Bedding Fill, the geomembrane shall be removed and <br /> CONTRACTOR shall recondition and recompact the Soil Liner Fill to meet all <br /> placement and trimming SPECIFICATIONS, at no additional cost to CC&V. <br /> 7. CONTRACTOR shall remove all hubs and survey stakes in the Bedding Fill and backfill <br /> all holes with MANAGER and CERTIFYING ENGINEER approved material. <br /> 8. CONTRACTOR shall verify the final thickness of Bedding Fill to determine compliance <br /> with this SPECIFICATION. CONTRACTOR shall record as part of the as-built <br /> documentation the location, elevation,and thickness of each Bedding Fill verification <br /> test. CQA Monitor will witness all verification measurements.Areas with deficiencies <br /> shall be reworked by CONTRACTOR, until acceptable measurements are obtained at <br /> no additional cost to CC&V. If tests indicate the Work does not meet the <br /> requirements of the SPECIFICATIONS, MANAGER and CERTIFYING ENGINEER will <br /> establish the extent of the nonconforming area. The nonconforming area shall be <br /> Page 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.