Newmont-Cripple Creek&Victor Gold Mine <br /> Technical Specification No.02200 REV D <br /> Squaw Gulch VLF ■ <br /> Project No.475.0106.006 <br /> March 13,2020 <br /> approved by MANAGER and CERTIFYING ENGINEER and will backfill holes with Drain <br /> Cover Fill. Areas with deficient thickness shall be reworked by CONTRACTOR, until <br /> acceptable measurements are obtained. If MANAGER or CERTIFYING ENGINEER <br /> suspects the occurrence of any damage to the underlying geosynthetics, MANAGER <br /> will instruct CONTRACTOR to remove Drain Cover Fill to expose the geosynthetics. <br /> CONTRACTOR shall uncover, repair any observed damage of the underlying <br /> geosynthetics, in accordance with the repair requirements of Sections 02776.0 and <br /> 02777.0 of these SPECIFICATIONS and recover, at no cost to CC&V. <br /> 10. CONTRACTOR will provide adequate illumination as approved by MANAGER, if Drain <br /> Cover Fill placement is carried out at night. A minimum of 2-foot candles measured <br /> at the synthetic liner shall be used when Drain Cover Fill placement is carried out at <br /> night <br /> I. Pipe Bedding Material <br /> 1. Pipe bedding material shall be placed around the CSP as shown on the drawings. <br /> 2. For piping external to the valley leach facility, CONTRACTOR shall compact the Pipe <br /> Bedding Material requiring compaction to at least 95 percent of the maximum dry <br /> density as determined by the Standard Proctor density test (ASTM D698), and a <br /> moisture content 3 percent below and 3 percent over the optimum moisture <br /> content. <br /> 3. CONTRACTOR shall place Pipe Bedding Material in maximum 12-inch loose lifts. Pipe <br /> Bedding Material will be worked under pipe haunches by hand to provide uniform <br /> support of the CSP. <br /> 4. Native material used for backfilling CSP excavation shall be placed in 12-inch to 18- <br /> inch loose lifts, and compacted by wheel rolling with light, rubber tired or other light <br /> compaction equipment, as approved by CERTIFYING ENGINEER. <br /> J. Granular Filter Material <br /> 1. Granular Filter Material shall be placed beneath the Riprap as shown on the <br /> drawings. <br /> K. Bedding Fill <br /> 1. Bedding Fill shall be placed within the limits of the valley leach facility as shown on <br /> the DRAWINGS. <br /> 2. CONTRACTOR shall place and compact the Bedding Fill in loose lifts such that the <br /> compacted lift thickness is a minimum of 12-inches. CONTRACTOR shall condition <br /> the Bedding Fill to allow a surface that does not cause rutting or other deleterious <br /> effects. The moisture content and density shall be uniform throughout the lift. If a <br /> lift of compacted Bedding Fill dries out during placement operations, CONTRACTOR <br /> shall scarify, moisture condition the dry soil and recompact the lift. If a lift of <br /> Page 19 <br />